Laserfiche WebLink
<br />., <br /> <br />~ <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />COM <br /> <br />Statewide Water Supply Initiative <br />Preliminary Report Outline - May 17, 2004 <br /> <br />6 Water Needs Assessment <br /> <br />6.1 Overview of Method <br />6.2 Increase in Demands from 2000 to 2030 (Task 9.4) <br />6.3 Approach to Meeting Water Demands <br />6.4 Identified Projects and Processes ff1lsJ<10.1, 10.3) <br />6.5 Risk and Uncertainty in Identified Projects/Processes and Existing <br />Groundwater Supplies <br />6.6 Gap Analysis '(TajkTQ:.iJ <br />6.6.1 Gap at 0 Percent Uncertainty <br />6.6.2 Gap with Risk at 25 Percent Uncertainty Scenario <br />6.6.3 Gap with Risk at 50 Percent Uncertainty Scenario <br /> <br />7 Availability of Existing Water Supplies (Task 8) <br /> <br />7.1 <br />7.2 <br /> <br />Method and Tools Employed <br />Available Supply in Each Basin <br />7.2.1 Arkansas Basin <br />7.2.2 Colorado Basin <br />7.2.3 Gunnison Basin <br />7.2.4 North Platte Basin <br />7.2.5 Rio Grande Basin <br />7.2.6 San Juan/Dolores/San Miguel Basin <br />7.2.7 South Platte Basin <br />7.2.8 Yampa/White/Green Basin <br /> <br />8 Future Options <br /> <br />8.1 Specific Projects Identified through Basin Roundtables for Each Basin <br />8.2 Major Types of Options :cfa.~Wl()~2i <br />8.2.1 Conservation <br />8.2.2 Reuse <br />8.2.3 Reservoirs <br />8.2.4 Agricultural Transfers <br />8.2.5 Transbasin Options <br /> <br />9 Evaluation Framework <br /> <br />9.1 Overview of Process <br />9.2 Stakeholder Process <br />9.2.1 CWCB Board <br />9.2.2 Basin Roundtables <br />9.2.3 Public Outreach <br />9.3 Defining Objectives and Performance Measures ('r,'\sl?iIl] <br />9.4 Stakeholder Preferences <br /> <br />PRELIMINARY DRAFT <br /> <br />3 <br /> <br />S:\Report\SW$l Report OutUne 05170.4.docS/17J200.4 <br />