Laserfiche WebLink
<br />. . <br /> <br />, <br /> <br />14. Water Project Construction Loan Program - Guidelines (3:00 - 3:15) <br /> <br />a. Interest Rate Policy for Loans with Repayment Periods less than Standard <br /> <br />15. Water Project Construction Loan Program - Reconnaissance and Feasibility Studies (3:15 - 3:50) <br /> <br />a. Small Dam Site Reconnaissance Program <br />b. City of Ft. Morgan . <br />c. Colorado River Water Conservation District - Elkhead Reservoir Expansion Study <br /> <br />16. Water Project Construction Loan Program - Design and Construction (3:50 - 4:00) <br /> <br />a. Status report on completed projects <br />b. Status report on projects under construction <br />c. Status reports on projects under design <br /> <br />17. Water Project Construction Loan Program - Mitigation Account (4:00 - 4: 10) <br /> <br />a. Colorado River Water Conservation District - Wolford Mountain Reservoir <br /> <br />18. Water Project Construction Loan Program - Proposed Increases in Previous Project Authorizations <br />(4:10 - 4:15) <br /> <br />a. Divide Canal and Reservoir Company <br /> <br />19. Water Project Construction Loan Program - A Closer Look (4:15 - 4:55) <br /> <br />a. 1995 Marketing Plan <br />b. Water Project Planning <br /> <br />20. Executive Session Items (4:55 - adjournment) <br /> <br />a. Background briefings (open to public) <br /> <br />1. Case Nos. 1-87CW278, 282, 283; North and South Saint Vrain Creeks <br />2. Case No. 92SA68; Arapahoe COlmty (Union Park) <br />3. Case No. 4-92CW107; Proposed Stipulation with Arapahoe County Concerning TNC <br />Donation (Gunnison River) <br />4. Case No. 5-9ICW247; Orchard Mesa Check Operations <br />5. USFS Reserved Rights Cases in Divisions 2, 3"and 7 <br />6. Case No. 3-94CW39; USFS Application for Instream Flow on East Middle Creek <br /> <br />b. Public comment on Executive Session Items <br />c. CWCB Executive Session <br /> <br />4 <br />