My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD02119
CWCB
>
Board Meetings
>
Backfile
>
2001-3000
>
BOARD02119
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 3:12:17 PM
Creation date
10/4/2006 7:11:05 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
11/19/2001
Description
CF Section - Construction Fund New Loans - City of Fountain - Kelton Reservoir Rehabilitation
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />.' . <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />PROJECT SUMMARY <br /> <br /> <br />Rehabilitation of Keeton Reservoir <br />City of Fountain <br /> <br />Proiect: Rehabilitation of Keeton Reservoir <br /> <br />Proiect Sponsor: City of Fountain <br /> <br />Amount of Loan ReQuested: $420,000 from the Construction Fund <br /> <br />Tvpe of Proiect: Rehabilitation of an existing dam <br /> <br />Location: On Little Fountain Creek about six miles south of Colorado Springs and one- <br />half mile west of Highway 115 near Fort Carson in El Paso County <br /> <br />Proiect Description: The purpose of the project is to provide the necessary modifications <br />to Keeton Dam in order that the dam is not reclassified as a moderate or high-hazard <br />structure. The selected alternative involves lowering the existing emergency spillway on <br />the south side of the reservoir by 12.5 feet and increasing the spillway width to 30 feet. <br />The discharge channel would extend from the upper part of the reservoir through the <br />spillway to below the dam directing streamflows away from the reservoir. <br /> <br />Schedule: Design drawings will be prepared early next year for review by the SEO and <br />CWCB staffs. Construction is expected to start in September of 2002 and should be <br />completed in November of 2002. <br /> <br />Total Estimated Proiect Cost: $465,000 <br /> <br />Keeton Dam Location Map <br /> <br /> <br />- <br />
The URL can be used to link to this page
Your browser does not support the video tag.