My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD02113
CWCB
>
Board Meetings
>
Backfile
>
2001-3000
>
BOARD02113
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 3:12:16 PM
Creation date
10/4/2006 7:11:03 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
11/23/1998
Description
Summary Minutes and Record of Decisions - November 23-24, 1998
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />, <br /> <br />" <br />. <br /> <br />motion was seconded by Alan Hamel and approved unanimously (9-0). <br /> <br />e <br /> <br />26a. Water Project Construction Loan Program - Non-Reimbursable studies and <br />Investigations - Rio Grande Decision Support System - Year 2 Development <br />Tape 5, Start/Stop: 3626 - 3972 <br />Action: A motion was made by Alan Hamel to accept the staff recommendation to <br />recommend to the General Assembly that $2,983,380 for RGDSS Years 2 <br />and 3, and 2.5 FTEs and $175,000 to the State Engineer's Office, for a total <br />of$3,158,380 be made available from the Construction Fund for the Rio <br />Grande Decision Support System project continuation. The motion was <br />seconded by Patricia Wells and approved unanimously (8-0). <br /> <br />26b. Water Project Construction Loan Program - Non-Reimbursable Studies and <br />Investigations - Satellite Monitoring System Maintenance <br />Tape 5, Start/Stop: 3972 - 4050 <br />Action: A motion was made by Janice Sheftel to accept the staff recommendation to <br />recommend to the General Assembly that $120,000 from the Construction <br />Fund be allocated to the State Engineer's Office for the continuation of the <br />Satellite Monitoring System in FY 99-00. The motion was seconded by <br />Bob Burr and approved unanimously (9-0). <br /> <br />26c. Water Project Construction Loan Program - Non-Reimbursable Studies and <br />Investigations - Imaging System for Construction Fund Project Files <br />Tape 5, Start/Stop: 4050 - 4427 <br />Action: A motion was made by Patricia Wells to accept the staff recommendation to <br />recommend to the General Assembly that up to $270,000 from the <br />Construction Fund be appropriated to DNR to combine CWCB efforts with <br />the State Engineer's Office and Oil and Gas Commission efforts to set up a <br />docUment imaging system. The motion was seconded by Bob Burr. The <br />motion was amended with the suggestion that the wording "in FY 2000" be <br />deleted and that the funds be available until the project is completed. The <br />amended motion was accepted by both the first and second, and approved <br />unanimously (9-0). <br /> <br />e <br /> <br />26d. Water Project Construction Loan Program - Non-Reimbursable Studies and <br />Investigations - South Platte DSS Scoping and Design <br />Tape 5, Start/Stop: 4427 - 4625 <br />Action: After much discussion on whether the CWCB and SEO are ready to begin <br />work on this project, this item was tabled until the January meeting. <br /> <br />26e. Water Project Construction Loan Program - Non-Reimbursable Studies and <br />Investigations - Statewide Floodplain Management Criteria Manual <br />Tape 5, Start/Stop: 4625 - 5241 <br /> <br />e <br /> <br />Minutes November 23-24, 1998 <br />
The URL can be used to link to this page
Your browser does not support the video tag.