My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD02109
CWCB
>
Board Meetings
>
Backfile
>
2001-3000
>
BOARD02109
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 3:12:09 PM
Creation date
10/4/2006 7:10:47 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
6/15/1950
Description
Table of Contents, Minutes and Resolutions. Volumes I and II of Transcription of Meeting
Board Meetings - Doc Type
Meeting
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
250
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />56 <br /> <br />he wl11 go on to the program conference. <br />I bell eve that covers It. <br />MR. BAILEY: Thank you, Xr. WilHams. <br />D. STONE: Xr. Ohalrman, Item 13 ls slmp1y a statement <br />to the effect that the South Platte Fl00d OontrolProJect 1s <br />lncluded 11'1 the 0mnlbuB Rivers and Harbors ana. Flood Control <br />Authorization Bill which Was recently passed by the Congress. <br />The South Platte Flood Oontrol Project conslsts of the Chatfield <br />. Dam, ohannel1zat1on down to a point near the Weld County 11ne <br />and some channel rectlflcat10n below that point. <br />Thls project Was included, 11'1 the Authorizat1on B11lby <br />the Senate 11'1 the last sesslon of Oongress but was rejected <br />by the House. This year it was accepted 11'1 both the House and <br />the Senate and approved in the conference oommlttee. The <br />project is now authorized for construction. Oonstruction can <br />not commence immed1ately because it reqa1resappropriations, <br />and none 11111 be undertaken before appropriations for the <br />flsoal year beglnnlng July 1, 1951. . <br />Sincs that proJect was proposed, the Water Board ap- <br />pointed a special CODlDlUtes to review the report. That oom- <br />mittee made oertain recoDlDlendations as to ohange 11'1 plans, <br />largely for the p11rpose of protec1iing irr1gation U8s down- <br />stream. The Army Engineers accepted all of the recommendations <br />of thls Board and included them 11'1 their final report. <br />The members of the Board who were at the December meet"; <br />
The URL can be used to link to this page
Your browser does not support the video tag.