My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD02103
CWCB
>
Board Meetings
>
Backfile
>
2001-3000
>
BOARD02103
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 3:11:58 PM
Creation date
10/4/2006 7:10:44 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
3/26/2001
Description
ISF Section - Proposed ISF Appropriation 2002 Work Plan Priorities
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />,I <br /> <br />Prioritv #10 = Initial Data Collection Complete - [All Water Divisions] <br />These streams could include; Water Division 4 - North Branch Spring Creek. Water Division 5- <br />Bitter Creek, George Creek, Kaiser Creek, Red Dirt Creek and Thomas Creek. <br /> <br />Instream Flow Recommendation Supported by: BLM <br />Seements belne withdrawn from ISF consideration: ' <br /> <br />1) South Fork Republican River <br />Staff is withdrawing this segment from the current ISF 2002 Work Plan because of concerns <br />expressed by the State Engineer and the CWCB:, The State Engineer has expressed concerns <br />regarding to water availability and to possible future litigation issues with the State of <br />Kansas. ! <br /> <br />Propo.ed ISl1 Appropriation 2001 Work Pin. Prlorlte. v3.doc <br /> <br />; <br />Flood Protecdon . Water Project Planning an~ Financing. Stream and toke Protecdon <br />Water Supply Protection. ,conservation Planning <br />
The URL can be used to link to this page
Your browser does not support the video tag.