<br />In June of 2000 the State Engineer's Office identified a seepage problem along the downstream slope and
<br />imposed a restriction on storage, Knight Piesold, Denver, Colorado, has completed the feasibility study and
<br />is currently working on the design plans, Construction is tentatively scheduled to occur in the fall of 2002,
<br />
<br />13, John Peroulis & Sons Partnership - Martin Cull Dam Rehabilitation
<br />
<br />Authorization: Small Project Loan
<br />Water Source: Fortification Creek
<br />Terms of Loan: $100,000 @5,O% for 30-years
<br />
<br />County: Moffat
<br />Project Yield: 250 acre-feet
<br />Project Type: Rehabilitation
<br />
<br />The JPSP operates the Martin Cull Reservoir for storage of irrigation water for use on 450 acres
<br />owned by the Partnership, The dam was constructed in the 1950's, it is a Class 3 structure, 53 feet high, and
<br />impounds 250 acre-feet of water. In the summer of 2000 a slide occurred on the upstream slope of the dam
<br />as water was being released for irrigation, The toe ofthe slide covered the upstream end of the outlet,
<br />damaging it and leaving in inoperable, Northwest Colorado Consultants, Steamboat Springs, Colorado, are
<br />currently working on design plans and specifications to rehabilitate the dam, The project is tentatively
<br />scheduled for construction in the fall of 2002,
<br />
<br />14, Silver Springs Trout FannlSherwood Trust - Trout Farm Rehabilitation
<br />
<br />Authorization: Construction Fund
<br />Water Source: R,D Corey Ditch
<br />Terms of Loan: $365,000 @3% for 15-years
<br />
<br />County: Montrose
<br />Project Yield: N/A
<br />Project Type: Rehabilitation
<br />
<br />The Silver Springs Trout Farm is located 3 miles west of Montrose and is currently operated as a
<br />commercial trout farm, The hatchery tested positive for whirling disease in 1997, at which time the owner
<br />constructed raceways to mitigate the affects of the disease, at a cost of $367,000, Since the installation of the
<br />raceways the hatchery has operated free of whirling disease, At this time the owner needs to rehabilitate the
<br />water collections system and construct a predator control structure over the raceways at an estimated cost of
<br />$58,000, The proposed CWCB loan is fund the new construction and to refl11ance debt already incurred by
<br />the trout farm, The project is currently under design and is anticipated to go to construction in June of
<br />2002,
<br />
<br />15, Parker Water and Sanitation District
<br />
<br />Authorization: Construction Fund County: Douglas
<br />Water Source: Cheny Creek Project Yield: 16,200 acre-feet
<br />Terms of Loan: $15,000,000 @4,75% for 20-years Project Type: Reservoir Construction
<br />
<br />The Parker Water and Sanitation District is currently in the design phase to construct the Rueter Hess
<br />Project for the storage of municipal water for its 7,924 customers, The new reservoir will provide terminal
<br />storage for use within the District's existing 8,596-acre service area, The reservoir will be located 3 miles
<br />southwest of Parker on Newlin Gulch, The proposed reservoir will be a Class I structure, 135 feet high,
<br />impounding approximately 16,200 acre-feet of water. GEl Consultants, Denver, Colorado, will be putting
<br />together the final design and construction documents, The project is tentatively scheduled to go to
<br />construction winter/spring of 2003,
<br />
<br />16, Lake Henrv Reservoir Companv - Reservoir Rehabilitation