Laserfiche WebLink
<br />".. <br /> <br />Windsof Reset'VOIr & Company <br />July 28-29 2003 <br /> <br />Agenda Item 21a <br /> <br />Water Project Construction Loan Program-Project Data <br /> <br />. <br /> <br />Borrower: Windsor Reservoir & Canal Co. <br /> <br />County: Larimer <br /> <br />Project Name: Windsor Res. No. a/Annex <br /> <br />Project Type: Rehabilitation <br /> <br />Drainage Basin: South Platte <br /> <br />Water Source: Cache La Poudre River <br /> <br />Total Project Cost: $750.000 <br /> <br />Funding Sources: CWCB. WRCC <br /> <br />Type of Borrower: Agricultural <br /> <br />Aver. Delivery: 620 acre-feet <br /> <br />CWCB Small Project Loan: $675.000 <br /> <br />Interest Rate: 2.50% <br /> <br />Term: 30 years <br /> <br />The Windsor Reservoir & Canal Company ('NRCC) is applying for a loan to recover 620 acre-feet of <br />storage in ttleir Windsor Reservoir No. B and No. 8 Annex. by excavating and removing up to <br />1,000,000 cubic yards of sediment. The WRCC service area extends from their Cache la Poudre <br />diversion north of Fort Collins east to near the town of Galeton northeast of Greeley, generally <br />bounded by the Eaton Drtch and the Greeley Ditch No. 2 Ditch. The total area encompassed is about <br />86.000 acres, providing water for irrigation for about 55.000 acres. WRCC typically uses about <br />31,000 acre-feet to irrigate the 55,000 acres. WRCC owns 6 reservoirs and about 25 miles of ditch <br />known as the Poudre Valley Canal. Reservoir NO.8 was purchased in 1911. Total decreed storage in <br />all reselVOirs is 65,562 acre feet. Windsor Reservoir No. 8 and No. 8 Annex are adjacent, inter- <br />connected, reservoirs that have a storage decree of 15,381 acre-feet, with current storage capacity at <br />12.700 acre-feet due to sediment accumulation. The project would provide an additional 620 acre-feet '. <br />of storage, allowing WRCC to supply Irrigation water for an additional 3 days. This is significant <br />because the total number of days the system normally runs is 30 to 45 days. The removed material <br />will be spread over 30 acres of land adjacent to the reservoir, and re-seeded to address erosion. <br /> <br /> <br />._~ ''V' <br /> <br />'; <br /> <br />...t':'~ <br />,.- <br /> <br />., <br /> <br />." <br /> <br />J <br /> <br />. <br /> <br />Location Map <br />