<br />9, Pine River Irrigation District - Pump and Pipeline Proiect
<br />
<br />e
<br />
<br />Authorization:
<br />Water Source:
<br />Terms of Loan:
<br />
<br />HB 00,1419 Severance Tax County: La Plata
<br />Pine River Project Yield: 1,600 acre,feet
<br />$341,000 @3.50% for 20-years Project Type: Distribution System
<br />
<br />The Pine River Irrigation District operates Vallecito Reservoir on the Pine River located approximately 15
<br />miles north of the Town of Bayfield, The eastern half of La Plata County is considered a water critical area, meaning
<br />that all of the water in the basin is used during certain periods, Most of the people in this area are utilizing
<br />groundwater resources that have limited quantity and are of relative poor quality, The purpose of the project is to
<br />provide a rural water system that is adequate in quantity and quality to the water critical areas in La Plata County. The
<br />overall project has many components, however, this particular loan is for diverting water from Vallecito Reservoir to a
<br />pressurized treatment plant The proposed project involves tapping into the existing outlet tunnel, constructing a 500
<br />foot pipeline to convey water to the treatment plant, a bridge over the spillway chute, and a pump when the reservoir
<br />water level is low or to pressurize the treatment plant. The project currently on-hold pending resolution of other
<br />outside funding issues,
<br />
<br />10, Dolores Water Conservancv District, WETP ACK
<br />
<br />Authorization:
<br />Water Source:
<br />Terms of Loan:
<br />
<br />SB 01-157 County: Montezuma
<br />Dolores River Project Yield: 7,840 acre-feet
<br />$7,260,000 @3,50% for 30,years Project Type: Distribution System
<br />
<br />e
<br />
<br />The District's WETP ACK ( Water for Everyones Tomorrow Package) proposal is intended to better manage
<br />the available resources ofthe Dolores Project to provide an additional 3,300 acre-feet of water for the fishery below
<br />McPhee Dam, increase municipal water supplies, and to provide water of the irrigation of additional lands. This
<br />project involves a system of pipelines, pumps, and related facilities to deliver water to the District's Dove Creek Canal
<br />system for the irrigation of 4,000 acres of new lands that are presently dry land farmed, Water will be delivered to
<br />irrigators in pipes under pressure for sprinkler irrigation only, Harris Water Engineers, of Durango, Colorado, is the
<br />planning and design consultant for the project. Construction is tentatively scheduled to commence in the summer of
<br />2003.
<br />
<br />II. Kenosha Trout Club - Lininger Lake Dam Rehabilitation and Water Purchase
<br />
<br />Authorization:
<br />Water Source:
<br />Terms of Loan:
<br />
<br />SB 01-157 Severance Tax County: Park
<br />Beaver Creek Project Yield: 156 acre,feet
<br />$600,000 @5.50% for 30-years Project Type: Dam Rehabilitation
<br />
<br />The Kenosha Trout Club is located 8 miles southwest of the Town of Grant, near Kenosha Pass, Lininger
<br />Lake, which is used for fish, wildlife, and recreation purposes by subdivision residents, is supplied by a junior water
<br />right that cannot be filled unless its consumptive use due to evaporation is replaced, The estimated average annual
<br />divertable volume is 110 acre,feet, and the evaporative loss needing augmentation is 46 acre,feet. The Association
<br />plans on purchasing senior water rights that are suitable for augmentation, Dam improvements include installing a
<br />low level outlet structure and raising the crest ofthe dam approximately 12,inches. Leonard Rice Consulting Water
<br />Engineers completed the feasibility study, Dam improvements are tentatively scheduled for construction if the fall of
<br />2002,
<br />
<br />12, Supplv Irrigation Ditch Companv - Knoth Reservoir Dam Rehabilitation
<br />
<br />e
<br />
<br />Authorization:
<br />Water Source:
<br />Terms of Loan:
<br />
<br />County: Boulder-N,E,ofLyons
<br />St, Vrain Creek Project Yield: 9,500 acre,feet
<br />$1,700,000@3.50%for30,years Project Type: Dam Rehabilitation
<br />
|