<br />to redesign certain aspects of the project in an attempt to reduce the overall cost of the job, The project is currently <br />on,hold pending the outcome of the Ditch Company's redesign of the reservoir. <br /> <br />tit 2. People Ditch Companv - People Ditch Diversion Structure Rehabilitation <br /> <br />Authorization: Small Project Loan <br />Water Source: South Platte River <br />Terms of Loan: $43,000 @3,75% for 20 years <br /> <br />County: Logan - N,E, of Sterling <br />Project Yield: 1,200 ac,ft, <br />Project Type: Diversion Structure <br /> <br />The People's Ditch Company historically diverted irrigation water from the South Platte River at an existing <br />diversion point located approximately 6 miles northwest of the Town of Sterling, This existing diversion structure <br />was damaged during the flood of 1995 and was entirely washed out in 1997, The proposed project is to construct a <br />new diversion structure along the Bravo Ditch, therefore eliminating the need for the existing structure, and then <br />construct approximately 1050 l.f. of 24" pipeline to transport the flow from the Bravo Ditch back to Peoples Ditch, <br />Bravo Ditch has agreed to allow People Ditch to convey their decree flows through their ditch system and then divert it <br />back to the existing People Ditch by means of the new diversion structure, The project is tentatively on,hold pending <br />resolution of the water courts ruling on changing the point of diversion, <br /> <br />3. Loveland. City of - Green Ridge Glade Reservoir Rehabilitation <br /> <br />Authorization: HB 98,1189 County: Larimer, W, of Loveland <br />Water Source: Big Thompson River Project Yield: 6,000 acre feet <br />Terms of Loan: $5,000,000 @ 4,75% for 10 yrs,Project Type: Dam enlargement <br /> <br />tit <br /> <br />This $19.2 million project is the enlargement of the Green Ridge Glade Reservoir northwest of Loveland, The <br />project consists of raising the crest of the existing dam approximately 60 feet, construction ofa new concrete labyrinth <br />weir spillway, and new multi-level intake gate tower outlet structure, The City has contracted with Woodward,Clyde <br />of Denver to prepare the final design and construction contract documents. Environmental studies have been complete <br />and the City is currently in the process of obtaining the necessary permits to realign the adjacent County Road, The <br />design is scheduled to be complete by June of 2002, with construction to follow in the fall of 2002, <br /> <br />4, Riverside Reservoir and Land Companv - Riverside Reservoir Spillwav Rehabilitation <br /> <br />Authorization: SB 98,1189 <br />Water Source: South Platte River <br />Terms of Loan: $450,000 @ 3,75% for 20 yrs, <br /> <br />County: Weld-NW of Wiggins <br />Project Yield: 200 ac.ft. <br />Project Type: Spillway Rehabilitation <br /> <br />This project is the construction of an emergency spillway on the Riverside Reservoir Dam, located II miles <br />northwest of Wiggins in Weld County, The State Engineer has placed a storage <br />restriction on the reservoir until an emergency spillway is completed, The Riverside Reservoir and Land Company <br />contracted with W,W, Wheeler and Associates of Denver to prepare construction plans and specifications, The State <br />Engineer's office and the Riverside Reservoir and Land Company are currently evaluating alternate spillway sizes, <br />Construction of the project is currently on,hold, pending resolution of the spillway size and downstream property <br />issues, <br /> <br />5, Tilton Lateral Incorporated, Tilton Lateral Rehabilitation <br /> <br />Authorization: Small Project Loan <br />Water Source: GVrC Mainlain <br />Terms of Loan: $100,000 @ 3.5% for 30,years <br /> <br />County: Mesa <br />Project Yield: 960 acre-feet <br />Project Type: Lateral Rehabilitation <br /> <br />tit <br /> <br />The Tilton Lateral is located offheadgate No, 160 of the Grand Valley Irrigation Canal (GVrC), which is <br />located in southeast Grand Junction. The Tilton Lateral Company operates the lateral to supply 36 shareholders water <br />to irrigate a 177 ,acre service area, The existing lateral is in poor condition and delivers only one half of its allocated <br />