My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD02091
CWCB
>
Board Meetings
>
Backfile
>
2001-3000
>
BOARD02091
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 3:11:37 PM
Creation date
10/4/2006 7:09:55 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
3/16/1978
Description
Agenda, Minutes, Resolution
Board Meetings - Doc Type
Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br /> <br />I <br /> <br />What I would like to do now is hear from Mr. Kochman. Mr. Kochman, <br />you are in favor of all these streamflow proposals in final form? <br /> <br />MR. KOCHMAN: That is correct, Mr. Chairman. <br /> <br />The Division of wildlife supports these recommendations as set forth <br />here. <br /> <br />MR. STAPLETON: Having heard that, is there any objection to the <br />suggested final recommendations? <br /> <br />MR. ROBERT FISCHER: I am Bob Fischer of the Denver Water Department. <br />We would like to speak in terms of the second page of the final recom- <br />mendations. <br /> <br />MR. STAPLETON: Bob, could you speak a little louder, please? <br /> <br />MR. ROBERT FISCHER: These are flows on the Williams Fork River. The <br />Denver Water Department diverts water from the Williams Fork River, the <br />headwaters of it. We have been doing so for inahy, many years. We also <br />have rights to complete the system which exists there today. They are <br />old rights, comparatively speaking. <br /> <br />This recommendation is broken down into two parts. And I would like <br />to address the top line, particularly. You have there a recommendation <br />for a stretch of about 8~ miles. We would recommend that this stretch <br />of river be broken down into two parts. In that 8~ miles, there are <br />two major tributaries coming in, Kinney Creek and Keyser Creek. About <br />halfway down the 8~ miles is located the Henderson Mill diversion point. <br /> <br />Back in 1969, when that project was under consideration, the Fish and <br />Wildlife Service studied the matter and completed a report which was <br />sent to the FOrest Service, under which the rights-of-way for that <br />project were to be obtained. The state of Colorado concurred in the. <br />recommendations of that report of the Fish and wildlife Service, which <br />recommendation was that there be a requirement by that company to <br />bypass 20 cfs. <br /> <br />Now, that point is below Kinney Creek. However, the recommendation <br />there is for a minimum flow of 30 cfs for the whole stretch. And what <br />we would recommend is that it be broken down into two parts from the <br />confluence which they start with below Darling Creek down to below <br />Kinney Creek and that that stretch have a minimum flow of 20 cfs in the <br />summer and 8 in the winter; and below Kinney Creek on down for the <br />remaining approximately one half of that stretch, that it remain as <br />30 cfs in the summer and 14 in the winter. <br /> <br />I know somebody is going to come back. and say, "Well, what. difference <br />does it make to the Water Department, because you have got senior water <br />rights up there?" Well, not only do we divert water under those rights <br />in priority but we also divert water by exchange when they are out of <br />priority and have been doing that since 1940. That is not a matter of <br />r.ecord in the courts., but it has been. going on, and we want to continue <br />~o do so. Insertion of a junior water right in the middle confuses me, <br /> <br />-15- <br />
The URL can be used to link to this page
Your browser does not support the video tag.