Laserfiche WebLink
<br />. <br /> <br />funding for the study be included in 1994 Legislation, and 2. that <br />funding in the maximum amount of $50,000 per year for a three year <br />contract period be authorized, but that the CWCB Board shall review . <br />the contract at the end of the first and second years and decide <br />whether to continue it in the following year. The motion was seconded <br />by Tyler Martineau and the motion passed unanimously (8-0) <br /> <br />Ken Salazar and Jim Lochhead were absent. <br /> <br />12g. Ruedi Reservoir purchase - reservation of <br />additional funds 10:52 -10:58 a.m. 11/10/93 <br />Tape 5 Start/Stop 1927 - 2265 <br />Action: A motion was made by Jim Lochhead that the Board direct staff to <br />explore the possibility and issues related to the purchase of the Ruedi <br />Reservoir facility and also direct staff to continue to encourage the <br />Bureau of Reclamation to pursue contracting on the round two water <br />sales in such a way as to address the concerns of the contractors with <br />regard to the term of the contracts and the reopening provisions. The <br />motion was seconded by David Smith and the motion passed <br />unanimously (8-0) <br /> <br />Ken Salazar was absent. <br /> <br />12h. Probable Maximum Flood (PMF) Research funding 10:28 - 10:29 a.m. 11/10/93 <br />Tape 5, Start/Stop 1142 - 1423 . <br />Action: A motion was made by Janice Sheftel to request $100,000 for the next <br />year to fund research on probable maximum flood in Colorado. The <br />motion was seconded by Tommy Thomson. Recommended that in the <br />justification for that that a justification paragraph be added into the <br />construction fund bill explaining to the Legislature the problem and <br />potential savings involved in this type of research. The motion passed <br />unanimously (8-0) <br /> <br />Ken Salazar and Jim Lochhead were absent. <br /> <br />12i, <br /> <br />Native Aquatic Species Facility funding <br />Tape 5, Start/Stop <br />Action: Reaffirm the action taken in Alamosa. <br /> <br />10:30 - 10:45 a.m. 11/10/93 <br />1425 - 1475 <br /> <br />13, Southern Pipeline Project Status Report 4:50 - 5:50 p.m. 11/9/93 <br />Tape 3, Start/Stop: 3199 - 5874 <br />Action: A motion was made by David Harrison that the Board instruct the <br />staff to go forward, using the basis of 2%, 40 years but do a <br /> <br />Draft Minutes November 9 - 10, 1993 CWCB Meeting <br /> <br />14 <br /> <br />e <br />