My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD02045
CWCB
>
Board Meetings
>
Backfile
>
2001-3000
>
BOARD02045
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 3:10:25 PM
Creation date
10/4/2006 7:08:32 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
9/13/2005
Description
CF Section - New Loans - High Line Canal Company - Smith Arroyo Siphon Replacement Project
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />High Line Canal Company <br />September 6, 2005 <br />Page 4 of 4 <br /> <br />Agenda Item 12c <br /> <br />I, <br /> <br />Table 2. Financial Ratios <br /> <br />It <br /> <br />Financial Ratio Without Project With, Project <br />Previous Years Future Years <br />Operating Ratio (revenues/expenses) 102% 108% <br />I weak: <100% I-I averaQe: 100% - 120%' - J strong: >120%1 (Average) (Average) <br />Debt Service Coverage Ratio 115% <br />(revenues-expenses)/debt service N/A (Average) <br />I weak: <100% 1- raveraoe: 100% - 120% I-I strono: >120%1 <br />Cash Reserves to Current Expenses 12% 14% <br />I weak: <50% I-I average: 50% - 100% I-Istrong: >100%1 (Weak) (Weak) <br />Annual Operating Cost per Acre-Ft Delivered" $4.54 $4,85 <br />Iweak: >$201- I average: $10 - $20' -I strong: <$101 (Strong) (Strong) <br /> <br />* Calculation based on an annual average of 100,000 acre-feet delivered by the Company <br /> <br />Collateral: As security for the CWCS loan the Company will pledge assessment revenues backed <br />by an assessment covenant and the Project. This security is in compliance with CWCS Loan Policy <br />#5 (Collateral). <br /> <br />Staff Recommendation <br /> <br />-- <br /> <br />Staff recommends a loan not to exceed $458,540 ($454,000 for project costs and $4,540 for the 1 % <br />Loan Service Fee) to the High Line Canal Company for engineering and construction costs <br />associated with the Smith Arroyo Siphon Replacement Project, from the Severance Tax Trust Fund <br />Perpetual Sase Account. The terms of the loan shall be a 20-year loan at 2.25% per annum. Final <br />approval of the loan shall be conditioned upon all standard contracting provisions of the CWCS <br />Loan Program. Security for the loan shall be collateral in compliance with CWCS Loan Policy #5. <br /> <br />Email copy: <br /> <br />Dan Henrichs, Superintendent <br />Gary Lake. Lake Engineering Consultants, Inc <br />Brice Boesch. PE. Boesch-Fisher Engineering, Inc. <br />Amy Stengel. AGO <br /> <br />Attachment: Water Project Construction Loan Program - Project Data Sheet <br /> <br />. <br />
The URL can be used to link to this page
Your browser does not support the video tag.