My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD02039
CWCB
>
Board Meetings
>
Backfile
>
2001-3000
>
BOARD02039
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 3:10:24 PM
Creation date
10/4/2006 7:08:30 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
7/20/2004
Description
CF Section - New Loans - Pinewood Springs Water District - New Reservoir and Raw Water Pipeline Construction and Water Rights Purchase
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />P,neWOOd Spnngs Water Dlsl!lct <br />July 20-21.2004 <br /> <br />Agenda Item 14e <br /> <br />Water Project Construction Loan Program - Project Data <br /> <br />Borrower: Plnewood Springs Water District <br />(PSWD) <br />Project Name: Drought Mitigation Project <br /> <br />County: Larimer <br /> <br />Drainage Basin: South Platte <br /> <br />Project Type: New Reservoir/Pipe linelWater <br />Rights Purchase <br />Water Source: little Thompson River, CST <br /> <br />Total Project Cost: $2.711.805 <br /> <br />Funding Sources: CWCS. CWRPDA. PSWD <br /> <br />Type of Borrower: Municipal (Middle Income) <br /> <br />Aver. Delivery: 51 acre.feet <br /> <br />CWCS Loan: $2.033.850 <br /> <br />Interest Rate: 4.00% <br /> <br />Term: 30 years <br /> <br />PSWD is located 11 miles east of Estes Park on US 36, and provides water to 268 taps with a <br />projected total of 350 taps at build-out. They draw surface water from the Little Thompson River <br />and treat it with an existing micro-filtration unit. PSWD has no raw water storage, and has been <br />severely impacted by water shortage in the past several years, spending about S180.000 to haul <br />water purchased from the City of Longmont. They are in need of a reliable and continuous supply <br />of raw water. Also, in 2002 the Sig Elk fire consumed thousands of acres above upstream of <br />PSWD on the Little Thompson River. resulting in a considerable amount of ash and other fire <br />related debris. This has caused severe plugging of the infiltration gallery and contamination of the <br />micro-filtration units. Subsequently, a number of planning studies have identified a several water <br />needs. In summary, the proposed project will provide the following raw water components: <br />construction of the 51 acre foot Crow Lane Reservoir #1 (35 foot high dam with outlet works and <br />emergency spillway meeting State dam design requirements), a new pump station, about 5500 If of <br />6" pve draw and fill transmission piping, modifications to the infiltration gallery intake, as well as <br />the purchase of as many as 90 eST water shares to provide a reliable water source for the <br />resel\foir. In addition, with the assIstance of a DWRF loan, PSWD will add an additional micro- <br />filtration treatment unit and replace about 4000 If of distribution piping, not part of the ewes loan. <br /> <br /> <br />MuoIW!Ue <br />C1'"~" <br />~~.,. <br />h:h'~ '- <br />~I: p'l \.&1.-" <br />iD~. .. <br />. ).":::,..... "inc\\(Jod <br />". , :Q~. c- ~ <br />11\.}. L.... ~I:rthou il <br />..],; ''''Mwood . 1 <br />..~ j)~~ ,--~. <br />.-.';"_'';'-~. -~_.- /. <br />.._ \IIM~kf'I'''fk' ...- <br />II'n' 1I .; <br />"-r'll"t~J ~. <br />. ......~ <br />~!"'f"'nd <br />,(I',i::, ymntown <br />. . <br />. <br /> <br />I ~II!'''''''' <br /> <br />~~~ <br />1 ~ <br />" <br /> <br />I <br />J <br /> <br />. ~ <br />~ <br /> <br />~:'~J) logl <br />.....".., <br /> <br />.. <br /> <br />Location Map <br />Page 7 of 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.