<br />Pinewood Springs Water District <br />July 20-21.2004 <br /> <br />Agenda Item 14e <br /> <br />The selected alternative, Alternative No.3, Crow Lane Reservoir #1 (35 foot high dam), involves <br />the construction of a new 51 acre-foot reservoir with outlet works and emergency spillway meeting <br />State dam design requirements. This will require acquisition of approximately 4 acres of land. The <br />other major raw water components of the project will include a new pump station, about 5500 lineal <br />feet of 6" PVC draw and fill transmission piping, modifications to the infiltration gallery, and <br />purchase of CST water shares. <br /> <br />The total project cost by each raw water project component is as follows: <br /> <br />1. Reservoir Construction <br />2. Land Acquisition <br />3. Pump Station, Pipeline & Appurtenances <br />4. Infiltration Gallery <br />5. Water Rights Purchase <br />6. Administrative and Legal Fees <br />7. Engineering and Project Inspection <br />8. Prior Planning Expenditures to DMP <br />TOTAL <br /> <br />$ 585,000 <br />235,000 <br />640,000 <br />65,000 <br />1,000,000 <br />18,000 <br />106,425 <br />62.380 <br />$2,711,805 <br /> <br />PSWD expects to secure its financing by August/September 2004. The Treatment Plant expansion <br />will be completed by October 2004. Final design, engineering and State approval will be completed <br />by December 2004, and construction is expected to begin in Spring 2005 and be completed by <br />December 2005. An Environmental Study is nearing completion, after learning that mitigating <br />efforts may be needed for the Preble Jumping Mouse habitat. No permits have been applied for at <br />this time but PSWD has been in contact with the Corps of Engineers and the U.S. Fish and Wildlife <br />Service. Purchase of water shares will be on the open market, and is dependent on the <br />acceptance of PSWD into the NCWCD. The petition process has been initiated and will be filed on <br />July 12, 2004. <br /> <br />Financial Analvsis <br /> <br />The totai estimated cost of the raw water portion of the project is $2,711,805, and PSWD qualifies <br />for the Municipal Middle Income interest rate. Staff is recommending a loan for a maximum <br />amount of $2,033,850 (75% of estimated raw water project cost) for 30 years at an interest rate of <br />4.00% per annum. In addition, PSWD has obtained a direct loan from the Drinking Water <br />Revolving Fund (DWRF), through the CWR&PDA, for $875,625 for the treatment plant expansion, <br />distribution line replacement, as well as a portion of the raw water costs. PSWD will cover any <br />costs that exceed the estimated project cost. <br /> <br />Project funding sources for the entire raw and treated water project are shown in Table 1. <br /> <br />Table 1: Proiect Fundina Sources <br />Funding Source Amount <br /> <br />CWCS Loan (Raw Water) <br />DWRF Loan <br />PSWD Fundino <br />Total <br /> <br />Page 4 of 7 <br /> <br />$2,033,850 <br />$ 875,625 <br />$ 199,625 <br />$3,109,100 <br /> <br />% <br />ParticiDation <br />65.4% <br />28.2% <br />6.4% <br />100% <br />