My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD02017
CWCB
>
Board Meetings
>
Backfile
>
2001-3000
>
BOARD02017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 3:10:00 PM
Creation date
10/4/2006 7:06:59 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
11/16/2004
Description
CF Section - New Loans - Upper Arkansas Water Conservancy District - North Fork Reservoir Rehabilitation and Expansion Project
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />J <br /> <br />Upper Arkansas Water Conservancy District <br />November g. 2004 <br />Page 3 014 <br /> <br />Agenda Item 14c <br /> <br />. <br /> <br />The District chose alternative 4 since it will satisfy all the needs for continued use of the facility <br />including enlarging the spillway to meet the Inflow Design Flood for a Class 1 dam, Rehabilitating the <br />outlet pipe will provide for an additional 50-year design life. The new outlet pipe will take advantage of <br />67 acre-feet of dead storage below the current outlet elevation. The enlargement project will add 500 <br />acre-feet of additional storage. The dam will be raised 15 feet and provide 7 feet of freeboard and allow <br />for the routing of the IDF with 1-foot of freeboard. The footprint of the enlarged reservoir will inundate <br />the access road and portions of the campground and parking lot. In addition, the access road from <br />State Highway 30 will require extensive improvements for construction. Since the reservoir is located <br />on Forest Service property, a NEPA study will be required. <br /> <br />Total Project cost estimate is: <br /> <br />TOTAL <br /> <br />$ 334,000 <br />2,975.850 <br />$3,309,850 <br /> <br />1. <br />2. <br /> <br />Plan ni ng/Permitting/Eng ineering <br />Construction <br /> <br />The engineering design, environmental studies and construction related services are provided by <br />Colorado River Engineering and Environmental Solutions, both of Rifle, Colorado. Construction is <br />expected to begin in 2005, <br /> <br />Financial Analvsis <br /> <br />Table 1 shows a summary of the financial aspects of the Project. A CWCS Loan of $2,980,000 would <br />have an annual debt service obligation of $167,240 ($152,040 for annual loan payment and $15,200 for <br />the 10% reserve account) for the loan terms of 3.0% for 30-years. The debt service obligation <br />. represents a cost of $153 per acre-foot to rehabilitate and expand the reservoir. <br /> <br />Table 1. Financial Summary of Project <br /> <br />Total Project Cost $3,309,850 <br />CWCS Loan (90% of Total Proiect Cost)' $2,980,000 <br />CWCS Annual Loan Pavment $152,040 <br />CWCS Loan ObliQation (includinQ 10% debt reserve) $167,240 <br />Annual Project Cost per acre-foot (based on enlarged 1095 AF) $153/ac-ft <br /> <br />Creditworthiness: The District's Enterprise Fund currently has an outstanding revenue bond for <br />$600,000 which will last until December 2014. The revenue bond was used to purchase the Lake <br />Ranch in October 2004 for $1,200,000. The outstanding debt amount is $600,000 for the water rights <br />purchase on this property. The revenue bonds require a pledge of revenues. CWCS will require parity <br />with the existing loan. The District is not expected to have any additional debt service on this Project. <br /> <br />. <br />
The URL can be used to link to this page
Your browser does not support the video tag.