My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD01994
CWCB
>
Board Meetings
>
Backfile
>
2001-3000
>
BOARD01994
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 3:09:48 PM
Creation date
10/4/2006 7:06:28 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
7/23/2001
Description
Flood Section - Information Study - Inspection of South Platte River - Chatfield Channel Improvement Project
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />, <br />, <br /> <br />~ <br /> <br />e <br /> <br />e <br /> <br /> <br />e <br /> <br />STATE OF COLORADO <br /> <br /> <br />Colorado Water Conservation Board <br />Department ofN atural Resources <br />1313 Sherman Street, Room 721 <br />Denver, Colorado 80203 <br />Phone: (303) 866.3441 <br />FAX: (303) 866.4474 <br />WWW.cwcb.state.CQ,ll5 <br /> <br />Q <br /> <br />Bill Owens <br />Governor <br /> <br />TO: <br /> <br />Colorado Water Conservation Board Members <br /> <br />Greg E. Walcher <br />Executive <br />Director <br /> <br />FROM: <br /> <br />Larry Lang and Tom Browning <br /> <br />Dan McAuliffe <br />Acting Director <br /> <br />DATE: <br /> <br />July 3, 2001 <br /> <br />SUBJECT: Agenda Item 21.f, July 23-24,2001 Board Meeting- <br />Information Summary - Inspection of South Platte River - Chatfield Channel <br />Improvement Project. <br /> <br />INTRODUCTION <br />The Chatfield Downstream Channel Improvement Project encompasses approximately a 7 mile <br />reach of the South Platte River below Chatfield Reservoir. The flood control project was <br />constructed by the U,S. Anny Corps of Engineers in the 1980's, and ownership of the project <br />was turned over to the Colorado Water Conservation Board via a Memorandum of Agreement <br />between the State of Colorado and the Federal Government. <br /> <br />The CWCB is responsible for maintenance of the floodway and project areas. In past years, the <br />CWCB has relied heavily on the Urban Drainage and Flood Control District (District) to provide <br />maintenance services on behalf of the State. A joint team consisting of Corps, CWCB and <br />District personnel performs annual and post-flood inspections. The Corps' Inspection Report <br />contains project deficiencies and maintenance needs by the CWCB. <br /> <br />BACKGROUND <br />Annually, the Corps completes a thorough inspection of the project to ensure that the pToper ' <br />maintenance items are being completed, CWCB and UDFCD staff members regularly <br />participate in the inspections. Following each inspection, the Corps provides an inspection report <br />to the CWCB noting satisfactory, marginal, or unsatisfactory project features. The CWCB has <br />relied on assistance from the Urban Drainage and Flood Control District to perform the necessary <br />maintenance activities on behalf of the State of Colorado. At this time, there is no established <br />funding mechanism for the CWCB to perform the required tasks. The Colorado State Legislature <br />has not provided the CWCB with an on-going or annually funded program to meet the <br />maintenance needs for the project. <br /> <br />For several years the Corps' Tn-Lakes office has given an "unacceptable" rating to several <br />project features, most of which have been rectified by UDFCD maintenance activities. The one <br /> <br />Flood Protection. Water Project Planning and Financing. Stream and Lake Protection <br />Watee Supply Protection. Conservation Planning <br /> <br />I <br />
The URL can be used to link to this page
Your browser does not support the video tag.