My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD01993
CWCB
>
Board Meetings
>
Backfile
>
2001-3000
>
BOARD01993
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 3:09:48 PM
Creation date
10/4/2006 7:06:24 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
11/15/1984
Description
Agenda, Minutes, Memos
Board Meetings - Doc Type
Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
112
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />, ' <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />721 State Centennial 8ulldlng <br />1313 Sherman Street <br />Denver, Colorado 80203 <br />Phone: (~O~) 866-~441 <br /> <br />APPENDIX G <br /> <br />STATE OF COLORt\DO <br />~j"',' <br />, . <br />( '~4 . :. <br />, , <br /> <br />COLORADO WATER CONSERVATION BOARD <br />Department of Natural Resources <br /> <br />R <br /> <br />M <br /> <br />Richard D. lamm <br />Governor <br /> <br />A <br /> <br />N <br /> <br />D <br /> <br />U <br /> <br />E <br /> <br />M <br /> <br />o <br /> <br />M <br /> <br />,. William McDonald <br />Director <br /> <br />TO: <br /> <br />Members, CWCB <br /> <br />David w. Waiker <br />Deputy Director <br /> <br />FROM: Bill McDonald <br /> <br />DATE: November 5, 1984 <br /> <br />SUBJECT: Agenda Item 13, November 15, 1984, Board Meeting -- <br />1984 Colorado River Operations Study <br /> <br />Discussion <br /> <br />During the past year we have presented to you information on <br />a Bureau of Reclamation study and re-evaluation of the operation <br />of the major reservoirs on the Colorado River. The study involves <br />the definition of "feasible," alternative operation strategies and <br />a standard method for quantifying the effects of each strategy (as <br />measured in terms of minimizing the risk of flooding in the Lower <br />Colorado River, water supply, flood control, and power generation). <br /> <br />The Bureau intends to complete and finalize the study by <br />February 1, 1985. A draft report is to be made available for <br />review by the states in early December, 1984. We will present the <br />study for the Board's consideration and comment when it becomes <br />available. <br /> <br />However, I have significant concerns even at this time about <br />the schedule for the completion of the study, the lack of <br />sufficient time to review and comment upon such a critically <br />important matter, and the lack of documentation about the computer <br />model which is being used to perform the study. I have voiced <br />these concerns to the Bureau previously, but without much success. <br /> <br />Recommendation <br /> <br />I recommend that the Board express concern about the manner <br />in which the study is being handled. Attached is a draft letter <br />to the Commissioner for this purpose. It is self-explanatory. <br /> <br />/bvm <br /> <br />Attachment: <br /> <br />as stated <br /> <br />APPENDIX G <br /> <br />718 <br />col/riv <br />
The URL can be used to link to this page
Your browser does not support the video tag.