Laserfiche WebLink
<br />. <br /> <br />Horseshoe Outlet Works Rehabilitation Study <br />Plan of Study <br />Page 4 <br />Methodology: <br />I. Incorporate the task memorandums into CWCB report format. The study will be prepared in <br />accordance with Appendix C of the Guidelines for Financial Assistance through the Colorado Water <br />Conservation Board Construction Fund. <br /> <br />. <br /> <br />Products: <br />1. The results of the alternative evaluation will be described and displayed in such a manner that the <br />differences between alternatives will be apparent. <br />2. The report will include a comparative evaluation which compares each alternative will all of the other <br />proposed alternatives. <br />3. The report will include conclusions and recommendations based upon the evaluation and comparison <br />of alternatives. The report will identifY a recommended alternative and will identifY the need for any <br />further investigations. <br /> <br />Task 6 - Coordination Meetings <br />Objective: <br />Close and continuous coordination with the project sponsors is required to assure that the project goals are <br />being achieved. Continuous coordination will be accomplished through discussions, monthly meetings and <br />project documentation. <br /> <br />Methodology: <br />I. Present monthly progress at the Company's monthly board meetings. <br />2. Distributing task memorandums to project sponsors. <br /> <br />. <br /> <br />Products: <br />I. Ongoing knowledge of the project status, schedule and budget. <br /> <br />ESTIMATED ENGINEERING COST <br /> <br />The estimated engineering cost is $5,000 lump sum amount. <br /> <br />..:t <br /> <br />D:\PROJECTSIHORSESHOEIHORSEPOS.DOC <br />