My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD01987
CWCB
>
Board Meetings
>
Backfile
>
2001-3000
>
BOARD01987
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 3:09:40 PM
Creation date
10/4/2006 7:06:10 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
7/13/1998
Description
CF Section - Greeley and Loveland Irrigation Company - Horseshoe #2 Reservoir Outlet Rehabilitation
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />Horseshoe Outlet Works Rehabilitation Study <br />Plan of Study <br />Page 4 <br />Methodology: <br />I. Incorporate the task memorandums into CWCB report format. The study will be prepared in <br />accordance with Appendix C of the Guidelines for Financial Assistance through the Colorado Water <br />Conservation Board Construction Fund. <br /> <br />. <br /> <br />Products: <br />1. The results of the alternative evaluation will be described and displayed in such a manner that the <br />differences between alternatives will be apparent. <br />2. The report will include a comparative evaluation which compares each alternative will all of the other <br />proposed alternatives. <br />3. The report will include conclusions and recommendations based upon the evaluation and comparison <br />of alternatives. The report will identifY a recommended alternative and will identifY the need for any <br />further investigations. <br /> <br />Task 6 - Coordination Meetings <br />Objective: <br />Close and continuous coordination with the project sponsors is required to assure that the project goals are <br />being achieved. Continuous coordination will be accomplished through discussions, monthly meetings and <br />project documentation. <br /> <br />Methodology: <br />I. Present monthly progress at the Company's monthly board meetings. <br />2. Distributing task memorandums to project sponsors. <br /> <br />. <br /> <br />Products: <br />I. Ongoing knowledge of the project status, schedule and budget. <br /> <br />ESTIMATED ENGINEERING COST <br /> <br />The estimated engineering cost is $5,000 lump sum amount. <br /> <br />..:t <br /> <br />D:\PROJECTSIHORSESHOEIHORSEPOS.DOC <br />
The URL can be used to link to this page
Your browser does not support the video tag.