Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />COLORADO WATER CONSERVATION BOARD MEETING MINUTES <br /> <br />TABLE OF CONTENTS <br /> <br />Meetinq No. 167, Auqust 16, 1972 - Denver. Colorado Paqe <br /> <br />Status of uncompleted prejects authorized for construction <br />pursuant to the Colorado. River Storage Project Act (Animas- <br />La Plata, Bostwick Park, Curecanti. Dallas Creek, Dolores. <br />Fruitland Mesa, San Miguel, Savery-Pot Hook and West Divide) <br />Introduction by Mr. Sparks 1 <br />Presentation by Mr. Robins 2 <br />General discussien 13 <br />Presentation by Mr. Wiscombe 14 <br />Simulation of hydrologic and chemical-quality variations <br />in an irrigated stream-aquifer system <br />Introduction by Mr. Moulder 21 <br />Presentatien by Mr. Kenikow 22 <br />General discussion 28 <br />Elkhead dam <br />Presentation by Mr. Sparks 29 <br />General discussion 32 <br />Approval by beard of recommendation to Division of <br />Wildlife re enlargement 40 <br />Operation of revised ground water laws <br />Presentation by Mr. Kuiper 41 <br />General discussion 45 <br />Director's report by Mr. Sparks <br />Status of state water plan 51 <br />Flood control on Sand Creek and Tell Gate Creek 51 <br />Bear Creek project 52 <br />Chatfield floed control project 53 <br />Salinity problem on Colerado River 54 <br />Federal appropriations for Colorado. water projects 55 <br />Flood plain zoning for Boulder Creek <br />Statement by Mr. Dieffenderfer 57 <br />Proposed revised resolution re Boulder Creek 57 <br />Appreva1 of resolution of revised report <br />(See Appendix A) 57 <br />Election of Chairman and Vice-Chairman for ensuing year 57 <br />Approval of Attorney's contract 58 <br />Attorney's report by Mr. Moses <br />Status of Rainbow Bridge litigation 58 <br />Mexican salinity problem 59 <br />