My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD01983
CWCB
>
Board Meetings
>
Backfile
>
2001-3000
>
BOARD01983
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 3:09:38 PM
Creation date
10/4/2006 7:06:08 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
9/25/2000
Description
Agenda
Board Meetings - Doc Type
Agenda
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />. <br /> <br />. <br /> <br />4, <br /> <br />Approve Consent Agenda (Found on page 4) (9: 10-9: 15) <br /> <br />5. Rio Grande River Basin Director's report (9:15-9:25) <br /> <br />6. Platte River Basin Issues (9:25 - 10: 15) <br />a. Denver Director's report <br />b, North Platte River Basin Director's report <br />c, Platte River Basin Director's report <br />d. Platte River Endangered Species Cooperative Agreement - South Platte Water <br />Management and Storage Study <br /> <br />7. Arkansas River Basin Issues (10:15 - 10:45) <br />a, Arkansas River Basin Director's report <br />b. Division 2 Federal Reserved Rights Settlement Proposal <br /> <br />Break (10:45 - 11:00) <br /> <br />8, <br /> <br />Colorado River Basin Issues (II :00 - II :45 ) <br />a. Colorado River Basin Director's report <br />b. Gunnison River Basin Director's report <br />c. San Juan/Dolores River Basin Director's report <br />d, Yampa/White River Basin Director's report <br />e, Division 7 Federal Reserved Rights <br /> <br />9, Stream and Lake Protection - Resolved Case; Case No. 3-99CW033; McClung <br />(South Fork of the Rio Grande) (II :45 - 12:00) The Board had filed a statement of <br />opposition in this case because the application had the potential to injure the Board's <br />[SF. During settlement discussions, the applicant has agreed to include terms and <br />conditions in its decree which would now result in a very small (i.e" "de minimis") <br />impact to the Board's [SF. The [SF Rules only allow the staff to enter into such a <br />stipulated settlement if it is fully protective. This one is not and, therefore, the staff is <br />required to obtain Board approval to settle this case. <br /> <br />10. Lunch/Executive Session - (12:00-1: 15) <br />The Board may decide to discuss pending, on-going, or imminent litigation, or items <br />noticed for consideration at this meeting in executive session, Background briefings <br />any an opportunity for public comment will be provided before the CWCB decides to <br />go into executive session <br />a, Bear Creek Watershed ISF case numbers 94 CW 250,251,256,259 and 260 <br /> <br />Call to order at 1:00 p.m. <br /> <br />b, Executive Session Report (I: 15-1 :25) (Action may be taken by the CWCB based <br />upon the briefings and executive session discussions) <br /> <br />Flood Protection. Water Project Planning and Financing. Stream and Lake Protection <br />Water Supply Protection. Conservation Planning <br /> <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.