My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD01980
CWCB
>
Board Meetings
>
Backfile
>
2001-3000
>
BOARD01980
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 3:09:34 PM
Creation date
10/4/2006 7:06:03 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
2/5/1982
Description
CWCB Meeting
Board Meetings - Doc Type
Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> Statistical compnrtoon of candidate planu <br /> (..fter four-account analysh) <br /> Candidate plan <br /> Envlron- <br /> 1\lent.al Municipal <br /> Peaktns quality Nons truc- and <br /> power emphada tural industdal <br /> 'Consideration Unit Plan 3 Plan 1 Plan 8 Plon 9 <br /> Project water supply <br /> Municipal and industrial acre-feet 21.200 21,200 221.200 <br /> Depletion of Colorado River here-feet 35,600 7,400 2S0.900 <br /> Multipurpose facilities <br /> Dominguez Reservoir capacity acre-feet 302.000 700,400 <br /> Visitor center/museum square feet 6.600 6.600 <br /> Railroad relocation m11e8 30 30 <br /> Power faclltties <br /> Dominguez Powerplant capacity megawatts 18 36 <br /> Rim Basin Reservoir capacity acre-feet 9.900 <br /> Rim Basin PumpingJG!nerating <br /> Plant capacity megawatts 500 <br /> Annual bsseload seneratlon kllowBtthours 136.000.000 IS9.000.000 <br /> MunIcipal and industrial facllities <br /> Pipeline length miles 4.1 3.0 4.1 <br /> Pumping plant capacity cfu 74 74 74 <br />... Row water reservoir capacity acre-feet 43 43 43 <br />-i" Recreation faclltties <br /> lCannah Creek area recreation-day. 369.000 369,000 <br /> Wells Gulch area rec rea t ion-days 320,000 <br /> Escalante recreation-days 320,000 <br /> Other dispersed areas recreation-days 131.000 131.000 <br /> Whitcwater area recreation-days 85,000 <br /> Rafting 81tea number 2 3 3 2 <br /> Rafting days recreation-day. 40.000 5.000 5.000 40,000 <br /> Scenic overlooks number 1 .1 1 1 <br /> Fish and wIldlIfe considerations <br /> Private land acquired acres 2.611 1,65.5 1,6S5 9.07.5 <br /> Ueutlug structures nUluber 45 30 30 45 <br /> Backwater pond development number 1 2 2 1 <br /> Cultural resource consJderations <br /> PrJvate land acqulre~ acres 11 67 67 !I <br /> Sites developed number 27 27 27 10 <br /> SHes mitigated number 245 300 <br /> Total construction cost $1,000 641,111 3,630 21,850 374,809 <br /> Total annual cost $1.000 61.583 211 2.393 36,695 <br /> Total benefits $1,000 124,042 210 2.925 42,944 <br /> Benefit/cost ratio 2.01:1 1.0:1 1. 22.1 1.17:1 <br /> Net annual benefits $1,000 62,459 -1 532 6,249 <br /> 11 Lands needed are included In other feature acqutaltton.ll. <br />
The URL can be used to link to this page
Your browser does not support the video tag.