My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD01980
CWCB
>
Board Meetings
>
Backfile
>
2001-3000
>
BOARD01980
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 3:09:34 PM
Creation date
10/4/2006 7:06:03 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
2/5/1982
Description
CWCB Meeting
Board Meetings - Doc Type
Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />MEMORANDUM <br /> <br />COLORADO WATER CONSERVATION BOARD <br />J. Wjlfjam McDonald <br />Director <br /> <br />TO: Members, CWCB <br /> <br />FROM: Bill McDonald <br /> <br />DATE: January 28, 1982 <br /> <br />SUBJECT: Agenda Item io, February 5, 1982, Board Meeting-- <br />Closed Basin project <br /> <br />Introduction <br /> <br />As discussed at the December 3-4, 1981, Board meeting <br />(refer to my memo to the Board dated November 27, 1981), the <br />fish and wildlife mitigation features and the recreation, fish <br />and wildlife enhancement features of the Closed Basin Project <br />have been changed from those contemplated at the time the <br />project was authorized. At the December Board meeting I noted <br />that there was some confusion concerning the enhancement <br />features and costs involved. We have been ahle to clarify <br />these costs and the actions which need now to be taken. <br /> <br />Summary of Mitigation and Enhancement Features <br /> <br />The new mitigation and enhancement plans call for the <br />following f.eatures: <br /> <br />Mitigation: <br /> <br />Alamosa NWR <br />Blanca wildlife Habitat Area <br />San Luis Lake <br />Russell Lakes Waterfowl Mgmt. Area <br />Additional land acquisition <br /> <br />$ 503,000 <br />316,000 <br />o <br />4,081,000 <br />262,000 <br /> <br />$5,162,000 <br /> <br />Total Construction Cost <br /> <br />Enhancement: <br /> <br />Public Use Facilities, San Luis Lake <br />Stabilization of San Luis Lake <br /> <br />$1,739,000 <br />951,000 <br /> <br />$2,690,000 <br /> <br />Total Construction Cost <br />
The URL can be used to link to this page
Your browser does not support the video tag.