My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD01980
CWCB
>
Board Meetings
>
Backfile
>
2001-3000
>
BOARD01980
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 3:09:34 PM
Creation date
10/4/2006 7:06:03 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
2/5/1982
Description
CWCB Meeting
Board Meetings - Doc Type
Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />STATE OF COLORI\DO <br /> <br />COLORADO WATER CONSERvATION BOARD <br />Deparrment oj :'\lJtural Resources <br /> <br />323 State Cenlennial Building <br />1313 Sherman Street <br />Denver. Colorado 80203 <br />Phone: 13031839-3441 M E M 0 RAN DUM <br /> <br />,~of'.:dr <br />f.':::-~O~ <br />/,"'-"'" ,c. ,,,, <br />~(~~~~~'~\ <br />1.\,.,. "' .-.1" <br />\ ,.,"- -I.' <br />\~:~/.. <br />"~.~ <br /> <br />TO: <br /> <br />Members, CWCB <br /> <br />Ricnard D. LJ'T'.m <br />Go~'ernor <br />). '.VilliJm "lI::DonJld <br />O:re<:tor <br />Oavid \",aiker <br />Deputy Director <br /> <br />FROM: <br /> <br />Bill McDonald <br /> <br />DATE: January 28, 1982 <br /> <br />SUBJECT: Agenda Item 7, February 5, 1982, Board Meeting-- <br />Dominguez Reservoir Project <br /> <br />Introduction <br /> <br />The U.S. Bureau of Reclamation (Bureau) was authorized in <br />1972 to conduct a feasibility study of the proposed Dominguez <br />Reservoir Project, which project would be located on the lower <br />Gunnison River about 10 miles south of Grand Junction. The <br />Bureau has recently released the Draft Feasibility Report and <br />Advance Draft EIS (December, 1981) for the project. <br /> <br />Comments are being solicited from interested parties prior <br />to the finalization of the report. In particular, the Regional <br />Director, Cliff Barrett, has advised that the Bureau would like <br />to know what further steps, if any, the State of Colorado would <br />like to take with respect to the project. <br /> <br />Summary of Project Alternatives <br /> <br />The draft feasibility study examines several alternatives, <br />or so-called candidate plans. The candidate plans are as <br />follows: <br /> <br />1. Peaking power plan (plan 3 in the report) <br /> <br />2. Municipal and industrial water supply plan (plan 9 in <br />the report) <br /> <br />3. Environmental quality plan (plan 7 in the report) <br /> <br />4. Non-structural plan (plan 8 in the report) <br /> <br />The first two of these plans would involve the construction of <br />Dominguez Reservoir, while the latter two plans would involve no <br />reservoir at all. The peaking power and non-structural plans <br /> <br />COLORADO WATER CONSERVATICN SOARD, Freeerick V. Kroeger, Chairman <br />Robert A. Jackson, Vice Chairman. JOhn R. Fetcher, Steamboat Springs <br />C.M. Furneaux, Walden. Floyd L. Gatz. Monte Vista. Patrick A. Gorm!ey. Grand Junction <br />Richard W. Johnston, Montrose. David W. ?cbbins, Denver. Herbert I-L Vandemoer, Sterling <br />
The URL can be used to link to this page
Your browser does not support the video tag.