My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD01971
CWCB
>
Board Meetings
>
Backfile
>
2001-3000
>
BOARD01971
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 3:09:30 PM
Creation date
10/4/2006 7:05:55 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
3/22/2005
Description
WSP Section and CF Section - Feasibility Study Status Report - La Plata Water Conservancy District - Long Hollow and Red Mesa Ward Reservoirs
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />EXHIBIT 6-1 OPINION OF PROBABLE COST (continued) <br />Intake Sfnlcture <br />Concrete, reinforced -Intake Wingwall (furnish and place) 10 CY $325 $3,250 <br />Concrete, reinforced -120 feet fall (furnish and place) 400 CY $600 $240,000 <br />Sluice Gates and Operating Equipment - 48"x48" 2 EA $107,000 $214,000 <br />Sluice Gates and Operating Equipment ~ 30"x30" 1 EA $40,000 $40,000 <br />Intake Operating Building 1 EA $15,000 $15,000 <br />Access Bridge 180 ft. span, weathered steel, 6 ft.wide wood deCk,(10k single axle) 1 EA $225,000 $225,000 <br />50illwav <br />Concrete, reinforced. Control Section (furniSh and place) 1,650 CY $300 $495,000 <br />Anchor Bars - #8 bar grouted in 3.5 inch diameter hole, 15 ft. deep at 10 feel c-c 220 EA $600 $132,000 <br />Concrete, reinforced. Slope protection {furnish and place) 865 CY $300 $259,500 <br />Anchor Bars _ #8 bar grouted in 3.5 Inch diameter hole, 15 ft. deep at 1Q feet c..c 200 EA $600 $120,000 <br />CAPITAL COSTS (Subtotal) $11,721,250 <br />Geotechnical Investigation (abutments, foundation, borrow & outlet alignment) $200,000 <br />Engineering Design SelVices (5 % of capital Costs) $586,063 <br />Construction Phase SelVices (2.5% of Capital Costs) includes: $293,031 <br />SUlVey (owner established control & checking) <br />Geotechnical QAlOC (on~site & laboratory testing) <br />OWner Co~s.Englneering Quality AssuranceJlegallAooounting (1.5% ot Capital CDstS) $175,819 <br />Land-Easement Acquisition 250 Acres $2,000 $500,000 <br />SUBTOTAL $13,476,163 <br />CONTINGENCY (15%) $2,021,424 <br />TOTAL $15,497,587 <br /> <br />WtightWaterEngineers,lnc. <br />10:16 AM 312112005 <br /> <br />WestemlaPlala <br />Pftljed <br /> <br />20f2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.