My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD01971
CWCB
>
Board Meetings
>
Backfile
>
2001-3000
>
BOARD01971
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 3:09:30 PM
Creation date
10/4/2006 7:05:55 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
3/22/2005
Description
WSP Section and CF Section - Feasibility Study Status Report - La Plata Water Conservancy District - Long Hollow and Red Mesa Ward Reservoirs
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Long Hollow Reservoir <br />Feasibility Study <br /> <br />grout curtain cut -off wall beneath the center of the dam. This grout curtain wall extends to a <br /> <br />depth of 100 feet and consists of angled grout holes spaced on 10 feet center to center across the <br /> <br />entire crest length of the dam. In addition, the overburden soil and rock beneath the dam are sub- <br /> <br />excavated to a depth of 10 feet and replaced with compacted fill consisting of the Lewis Shale. <br /> <br />Finally, a seepage blanket is placed on the slopes and the floor of the reservoir upstream from the <br /> <br />dam. The seepage blanket will be constructed by removing the natural fractured rock in the area <br /> <br />and replacing it with a compacted fill consisting of Lewis Shale. The final seepage control <br /> <br />features will depend on additional geotechnical investigation and final design. <br /> <br />An instrumentation program of surface survey monuments and piezometers to monitor water <br /> <br />pressure in the embankment at multiple levels is recommended for the enlarged embankment and <br /> <br />included in the cost estimate. <br /> <br />LHR is shown on Exhibit 3.1-1. The exhibit contains a table that shows the coverage and <br /> <br /> <br />acreage on affected land parcels resulting from the enlargement. <br /> <br />An opinion of probable cost for the 5,400-AF enlarged dam and reservoir is presented in Exhibit <br /> <br /> <br />6-1. The estimated cost for the reservoir is approximately $13,476,000. This estimate is <br /> <br />considered to be accurate within a range of "=15 percent. The cost per AF of storage will be <br /> <br />$2,496. The operation, maintenance, and repair costs for the LHR are estimated to be <br /> <br /> <br />approximately $22,000 per year for operation and maintenance and approximately $30,000 per <br /> <br />year for replacement reserve. These costs are based on extrapolations from the Red Mesa <br /> <br />Reservoir operated by the Red Mesa Ward Reservoir Company. <br /> <br />This report has been prepared in accordance with generally accepted engineering practices in this <br /> <br />area for use by the client for planning purposes. The conclusions and recommendations <br /> <br />submitted in this report are based upon the data described in the report text. Final design of the <br /> <br />dam and appurtenant structures will depend upon additional data, as described in section 7. <br /> <br />991-077.120 <br />March 2005 <br /> <br />Wright Water Engineers, Inc. <br /> <br />Page 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.