Laserfiche WebLink
<br />. <br /> <br />d. storage reauirements-studied needs and reported needs <br /> <br />Studied Needs- <br />Colorado Springs <br />Other FV A Entities <br />Entities West of Pueblo <br />Winter Water Storage Program <br />Replacement Water Storage <br /> <br />Other Reported Needs <br />Pueblo Water Works <br />Public Service Company <br />Pueblo West Metro <br />St. Charles Mesa <br />Florence <br /> <br />Total <br /> <br />e. analvsis of Frv-Ark Proiect supplies and storage <br /> <br />45,000 af <br />25,000 af <br />5,000 af <br />40,000 af <br />? <br /> <br />20,000 af <br />5,000 af <br />5,500 af <br />5,600 af <br />2,300 af <br /> <br />158,400 (high) <br /> <br />(base ?) <br /> <br />. <br /> <br />Re-operation potentials and constraints <br />Colorado Springs Utilities Operations AnalysisILimitations <br />USBR Storage Need Study <br />Potential for Additional West Slope Imports <br /> <br />f. alternatives analvsis (started w/ 32 alternatives, then 14 alternatives were <br />scored against project criteria, cost range: $4 million to <br />$227 million for 9,000 to 100,000 af storage capacity ) <br /> <br />1. Lake Meredith enlargement <br />2. Re-operation of Fry-Ark Facilities <br />3. Turquoise lake enlargement <br />4. Clear Creek Reservoir <br />5. Tennessee Creek reservoir <br />6. Pueblo Reservoir enlargement <br /> <br />. <br />