My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD01965
CWCB
>
Board Meetings
>
Backfile
>
2001-3000
>
BOARD01965
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 3:09:26 PM
Creation date
10/4/2006 7:05:30 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
3/22/2005
Description
Flood Section - Presentation of the CWCB's Draft Rules and Regulations for Regulatory Floodplains in Colorado
Board Meetings - Doc Type
Memo
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
238
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />~ <br /> <br />.) ,r <br /> <br />.) <br /> <br />'{~ 1988 THE PUBLlC RECORD CORPORATION <br />ALL RiGHTS RESERVED <br /> <br /> <br />!lCR1,1-88 <br /> <br />F=iage 9 <br /> <br />1 evees, at conf1 uence:; with tri butari es, and at all f1 ow <br />control structures. In genera;, more cross sections are <br />needed to define energy losses in urban areas than in rural <br />areas, where steeper slopes are encountered, and on smaller <br />streams. Based on computed results, addit~ona1 cross <br />sections may be required if the slope of_the energy 9rade <br />line between successive cross sections decreases by more <br />than 50 percent.or increases by more than 100 percent. The <br />location of the crcss-secti6ns shall be shown on the work <br />maps. <br /> <br />MaD Accuracy. Vertical map accuracy shall De such that <br />at least 90 percent Df all contours are within 1/2. of the <br />contour interval, and the remaining contours are not in <br />error by more than 1 contour intervi1l.. HOI'izonta1. map <br />accuracy shall be such that at le~st 90 percent of the <br />planimetric features are plotted to within 1/40 inch as <br />measured at the map scale, and the remaining features are <br />plotted to within l/~O inch. <br /> <br />In areas where the ground is completely obscured by dense <br />brush or tree cover, .contours shall be plotted as <br />accurately as possible from the stereoscopic model, while <br />making full use of spot elevations obtained where the <br />ground is visible. Spot elevations shall have the same <br />vertical. and horizontal tolerance as the contours. Where <br />applicable, the work map shall carry the statement: "This <br />map complies with National Map Accuracy Standards." <br /> <br />B. Hydrologic Analysis <br /> <br />8.. <br /> <br />1. Freouency. The hydrologic ana1ysis shall include, at a <br />mlnlmum, calculations for the 10-, 50-, and 100-year <br />frequency flood peak discharges. The Board recommends that <br />the peak discharge for the SOO-year floOd b~ calculated in <br />addition to the other discharges. <br /> <br />2. Methodo1oQY. Peak discharges developed .from hydrologic <br />analysis for floodplain management purposes shall be <br />determined by one or more of the following methods <br />depending on the length of systematic records available: <br />statistical. analysis .or regional regression analysis of <br />stream gage dat~, including historic flood data; <br />comparisons with similar watersheds; or flood estimates <br />using hydrologic models and precipitation records <br />(synthetic analysis). All available streamflow data from <br /> <br />THE CODE OF COLORADO REGULATIONS <br /> <br />2 CCR 408-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.