My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD01963
CWCB
>
Board Meetings
>
Backfile
>
2001-3000
>
BOARD01963
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 3:09:17 PM
Creation date
10/4/2006 7:05:25 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
9/10/2002
Description
OWC Section - Drought Assessment Update
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />ST A TE OF COLORADO <br /> <br />Colorado Water Conservation Board <br /> <br />Department of Natural Resources <br />1313 Sherman Street, Room 721 <br />Denver, Colorado 80203 <br />Phone:~03)866-3441 <br />FAX: (303) 866-4474 <br />www.cwcb.state.co.us <br /> <br /> <br />MEMORANDUM <br /> <br />Bill Owens <br />Governor <br /> <br />Greg E. Walcher <br />Executive Director <br /> <br />TO: <br />FROM: <br />DATE: <br /> <br />Colorado Water Conservation Board Members <br />Brad Lundahl, Dan McAuliffe <br />August 28, 2002 <br /> <br />Rod Kuharich <br />CWCB Director <br /> <br />RE: <br /> <br />Agenda Item #14 - Drought Assessment Update <br /> <br />Dan McAuliffe <br />Deputy Director <br /> <br />. <br /> <br />Bouvette Consulting will update us at your meeting about the status of the Drought <br />Assessment. <br /> <br />The presentation will focus the project status and reviewing how this project relates to the <br />other projects you are considering funding (e.g., Colorado River Return Project and the <br />Statewide Water Supply Investigation). <br /> <br />The project update will include: <br /> <br />· Summarizing the survey participants; <br />· Reviewing the draft survey instrument; <br />· Discussing project activities to occur in the next two months; and <br />· Reviewing the overall project schedule (including the connection between this <br />project and other potential projects). <br /> <br />We also anticipate discussing the make-up and role ofthe Technical Advisory <br />Committee, your continuing role, and the timing of future review and input. <br /> <br />. <br />
The URL can be used to link to this page
Your browser does not support the video tag.