Laserfiche WebLink
<br />Project Construction Costs <br /> <br />Project construction costs allowable under C.R.S. 37-60-122.2 include: <br /> <br />Engineering <br />(Including preliminary, design and estimated construction phase, <br />not including mitigation related items) <br /> <br />Facility Construction (not including mitigation items) <br /> <br />Total allowable construction cost <br /> <br />Basis of Grant Request <br /> <br />Allowable Project Cost <br />Total Mitigation Cost <br /> <br />$20,971,082 <br />$ 3,170,406 <br /> <br />First 5% of $20,971,082 responsibility ofproject <br /> <br />Second 5% of$20,971,082 grant eligible from CWCB <br /> <br />Remaining mitigation cost responsibility of project <br /> <br />$ 1,073,298 <br /> <br />Detail of Mitigation Costs <br /> <br />Wetland Mitigation <br /> <br />Mitigation Area M1 <br />Mitigation Areas M2, M3, M4 <br />Estimated wetlands p1antings <br />Subtotal wetlands <br />Engineering @ 15% <br />Subtotal Wetlands Mitigation <br /> <br />Game Fish Mitigation Pool during Construction <br /> <br />Game fish mitigation pool during construction <br />Engineering @ 15% <br />Subtotal game fish mitigation <br /> <br />$ 1,298,4342 <br />$ 194,765 <br />$ 1,493,199 <br /> <br />Total Mitigation <br /> <br />2 <br /> <br />From General Dam Construction Contract, Mitigation Related Items <br />See attached spreadsheet <br /> <br />$ 2,802,914 <br /> <br />$18,168,168 <br />$20,971,082 <br /> <br />$1,048,554 <br /> <br />$1,048,554 <br /> <br />$ 304,683 <br />$ 953,7581 <br />$ 200.000 <br />$1,458,441 <br />$ 218.766 <br />$1,677,207 <br /> <br />$ 3,170,406 <br /> <br />t <br /> <br />. <br /> <br />. <br /> <br />. <br />