Laserfiche WebLink
<br />t <br /> <br />with the game fish mitigation pool in place to protect the game fishery. These measures include .. <br />tunneling the new outlet conduit into the partially full reservoir, construction of the outlet works <br />tower behind a coffer darn in the partially full reservoir and screening of the construction <br />spillway and other construction water discharges from the reservoir. Our engineers have <br />provided a comparison of the construction effort with and without the provision of a gamefish <br />mitigation pool. This comparison has been used with the actual construction costs to determine <br />the cost of this mitigation measure. Costs of the permanent fish containment screens and all <br />related facilities are not part of this grant application. <br /> <br />The project has been granted a Clean Water Act Section 404 permit by the U.S. Army Corps of <br />Engineers, No. 200375136, dated February 11, 2005, a copy of which is enclosed for your <br />reference. I have also included a copy of the 404 permit application as it discusses in more detail <br />the impacts to the project area and mitigation measures than the actual permit. The description <br />of the project, the summary of impacts, estimated project costs, and estimated mitigation costs <br />are also included for your information and consideration. <br /> <br />We look forward to the Board's, the Division's, and the Commission's favorable consideration <br />of our mitigation efforts and our mitigation grant request. Please contact me with any questions <br />or comments you may have. I am available to meet with you, the Board, the Division or the <br />Commission as necessary. <br /> <br />Sincerely, <br /> <br />. <br /> <br />RayD. Tenney, P.E. <br />Senior Water Resources Engineer <br /> <br />Enclosures: U.S. Army Corps of Engineers 404 Permit No. 200375136 <br />Application for U.S. Army Corps of Engineers 404 Permit No. 200375136 <br />Estimate of Costs Related to Construction with Game Fish Mitigation Pool <br />Estimate of Costs through Completion for the General Dam Construction <br />M.J. Miller Construction - Schedule of Values for Mitigation Area Ml <br /> <br />. <br />