Laserfiche WebLink
<br />e <br /> <br />e <br /> <br /> <br />Navajo-Gallup Water Supply Project 5-21-2001 <br /> <br /> <br />1. SAN JUAN RNER DIVERSION ALTERNATIVE year 2040 <br /> <br />. Provides projected water demand for service area through year 2040 <br /> <br />. Diversion from San Juan River using existing PMN diversion or an infiltration gallery to <br />Navajo 666 Corridor, Shiprock, Gallup, and Windowrock.. Includes treatment plant, <br />pumping plants, and pipelines. Pipelines connect to existing distribution systems and <br />includes tees for future distribution systems where none exists today. <br /> <br />. Diversion from NIIP facility (Cutter Reservoir) for Cutter Lateral service area, Jicarilla <br />Apache Nation, and NAPI. Includes treatment plant, pumping plants, and pipelines. <br /> <br />. Appraisal level construction cost $350,000,000 <br /> <br />2. SAN JUAN RIVER DIVERSION ALTERNATNE year 2020 <br /> <br />. Provides full projected water demand through year 2020. Assumes a water supply and/or <br />cost limitation. <br /> <br />. Downsized facilities from alternative #1 <br /> <br />. <br /> <br />Appraisal level construction cost $250,000,000 <br /> <br />3. NIIP ALTERNATIVE year 2040 <br /> <br />. Provides projected water demand through year 2040 <br /> <br />. Water diversion from Navajo Reservoir through NIIP facilities. <br /> <br />. Includes Moncisco Reservoir 11,000 af capacity, treatment plant, pumping plants, and <br />pipelines connected to existing distribution systems, and tees in pipeline for future <br />distribution systems where there are none currently. <br /> <br />. Appraisal level construction cost estimate $390,000,000 <br /> <br />4. NIIP ALTERNA TNE year 2020 <br /> <br />. Provides projected water demand through the year 2040. Assumes water supply and lor <br />cost limitations. <br /> <br />. Downsized facilities from alternative 3# <br /> <br />. Appraisal level construction cost estimate $270,000,000 <br />