My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Board Meeting 12/09/1998
CWCB
>
Board Meetings
>
Backfile
>
2001-3000
>
Board Meeting 12/09/1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 3:09:03 PM
Creation date
10/4/2006 7:05:08 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
12/9/1998
Description
ISF Section - Additional Information Regarding the Water Availability Analysis for the Tennessee Creek Instream Flow Recommendation
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />TABLE 2: ESTIMATED PORCUPINE STREAM FLOW <br /> <br /> OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP <br />Estimated Flow uJs of Lonas Gulch 7.05 4,05 3,14 2.94 3.14 3.14 6,35 40,54 82,00 56,50 18,39 9.46 <br />Basin ADoorlionment Method 1,27 0,73 0.57 0.53 0.57 0.57 1,14 7,30 14.76 10,17 3.31 1.70 <br />Synthetic HydrO!lraoh 1.40 0.92 0.67 0.55 0.51 0,56 1.40 9,30 27.00 9.00 3.20 1,90 <br />Averaae 1,33 0.62 0.62 0.54 0.54 0.56 1.27 8,30 20,88 9,58 3,26 1,80 <br /> <br />Line 1 shows the estimated Tennessee Creek flow upstream of Longs Gulch <br />Line 2 shows the etimated Porcuine Gulch flow using an area apportionment method from Line 1 <br />Line 3 show the estimated Porcupine Gulch flow from the USGS WRI Model 8~086 <br />Line 4 shows the average of Lines 2 and 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.