My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD01914
CWCB
>
Board Meetings
>
Backfile
>
2001-3000
>
BOARD01914
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 3:08:42 PM
Creation date
10/4/2006 7:04:38 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
12/4/1974
Description
Agenda or Table of Contents, Minutes, Resolution
Board Meetings - Doc Type
Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
95
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br /> <br />(5) Investigations are now being concentrated on <br />system of wells near the lower center of the <br />valley, with conveyance to Radium Reservoir site <br />about 20 miles to southeast. <br /> <br />(6) Investigations under way or scheduled this year <br />include drilling of pumping observation wells, <br />foundation exploration for Radium dam site, <br />reservoir basin investigations, mapping of <br />conveyance system alignment, evaporation research <br />and environmental impact studies. <br /> <br />(7) Major items in FY 1976 include pump well test <br />and ground water observations and H2S scrubber <br />technique. <br /> <br />(8) Invitation for bids to construct access roads to <br />well sites was opened yesterday. Invitation for <br />bids for foundation exploration at Radium dam <br />site was reissued and opening is scheduled <br />December 17, 1974. <br /> <br />(9) Specifications are being prepared and will be <br />issued soon for drilling of two test and 29 <br />observation wells. DPR is scheduled for end of <br />1976. <br /> <br />V. RECEIVED LETTER FROM MR. SPARKS OCTOBER 31. 1974 <br /> <br />Wanted to review in detail status of your authorized western.Colo- <br />rado projects. Specifically questions asked related to the <br />following: <br /> <br />A. Time Schedule <br /> <br />1. Completion of Definite Plan Reports. includin2 Environ- <br />mental Statements. . <br /> <br /> Scheduled Completion Dates Final <br /> Definite Draft <br /> Plan Environ. Public Environ. <br /> Project -Report Statement Hearin2 Statement <br /> Animas-La Plata Sept. 1976 Sept. 1976 Nov. 1976 Jan. 1977 <br /> Dallas Creek Jan. 1975 Feb. 1975 Apr. 1975 Aug. 1975 <br />I Dolores June 1975 June 1975 Aug. 1975 Oct. 1975 <br />.San Miguel Dec. 1977 Dec. 1977 Feb. 1978 Apr. 1978 <br />West Divide June 1978 June 1978 Aug. 1978 Nov. 1978 <br />Fruitland Mesa Aug. 1975 Oct. 1975 Dec. 1975 <br />Savery-Pot Hook Oct. 1975 Dec. 1975 <br /> <br />2. Proposed construction and advanced plannin2 schedules <br />You will recognize that because of a variety of factors <br /> <br />-16- <br />
The URL can be used to link to this page
Your browser does not support the video tag.