Laserfiche WebLink
<br />805 <br /> <br />Colorado Water Conservation Board <br /> <br />37-60-121 <br /> <br />..'.,.,. <br />.. <br /> <br />the same by the general assembly, or the board may- require such assurances from the pro- <br />ject sponsor as the board deems necessary in order to adequately protect the board's <br />investment in a project. <br />(3) The board may adjust the authorized interest rate, extend the authorized repayment <br />period for any project, and defer one or more annual payments if, in the board's opinion, <br />the entity requesting such adjustment, extension, and deferment demonstrates that it has <br />encountered significant and unexpected financial difficulties and that it has been duly dili- <br />gent in its efforts to comply with the repayment provisions of its contract with the board. <br /> <br />Source: L. 71: p, 1344, ~ 2. C.R.s. 1963: ~ 149-1-20. L. 84: Entire section amended, p. 958, <br />i 10, effective May 21. L. 85: Entire section amended, p, 1153. ~ 3, effective June 2. L. 96: <br />(1) and (3) amended, p, 991, ~ 11. effective May 23. <br /> <br />. <br /> <br />37-60.121. Colorado water conservation board construction fund . creation of.. nature <br />of fund. .. funds for investigations .. contributions ~ use for augmenting the general. <br />fund. (1) (a) There is hereby created a fund to be known as the Colorado water conser. <br />vation board construction fund, which shall consist of all moneys which may be appropriat- <br />ed thereto by the general assembly or which may be otherwise made available to it by the <br />general assembly and such charges that may become a part thereof under the terms of sec- <br />tion 37-60-119. All interest earned from the investment of moneys in the fund shall be credo <br />ited to the fund and become a part thereof. Such fund shall be a continuing fund to be <br />expended in the manner specified in section 37-60-122 and shall not revert to the general <br />fund of the state at the end of any fiscal year, , <br />(b) In the consideration of making expenditures from the fund, the board shall be guid- <br />ed by the following criteria: . .' <br />(I) The first priority .of the moneys available to the fund shall be devoted to projects <br />which will increase the beneficial consumptive use of Colorado's undeveloped compact <br />entitled waters; , . . .' . <br />. (II) The balance of the moneys available to the fund shall be devoted to projects for <br />the repair and rehabilitation of existing water starage and delivery systems,controlled <br />maintenance of the satellite monitoring system authorized pursuant to section' 37.80'102 <br />(10), and for investment in water management activities and studies as provided in section <br />37.60-119 (3);,. .' . <br />., (III) The board's participation in the construction cost of a project shall be repaid and <br />the board's costs or its participation in anyfeasibility'studiesshall be repaid to the board <br />when construction on a project commences; . ' . . <br />. (IV) The board shall participate in only those projects which can repay the board's <br />investment. Grants shaUnot be made, unless specifically authorized by the general assem- <br />bly acting by bill, and service charges and other terms of repayment shall be established by <br />the board, . ' . ..... . .. ..' <br />(V) All other means of financing shall be thoroughly explored before'use is made of <br />fund moneys; . '.. .' " <br />(VI) Afteduly 1,1981, domestic water treatment and distribution systems shall not be <br />recommended by the board to the general assembly; ." ' <br />(VII) The board may recommend to loan funds on floodplain projects not to exceed <br />five percent of the annual projected revenue earned by the fund; . <br />(VIII) For all feasibility studies. the board shall ensure that the scope of the study is <br />confined as nearly as possible to a single integrated project; and <br />(IX) Any feasib~ity study oh proposed project shall include, to the extent deemed <br />necessary by the board, an evalmition of: "', ." . . . . . <br />(A) The water rights availableto a proposed project and the yieldthereof; <br />(B) .The engineering and economic feasibility of a proposed project; and . <br />(C) The anticipated economic, social, and environmental effects of a proposed project. <br />. (c) and (d) Repealed., .' . . <br />(2) . 'The board, in addition to the amount allocated to a project to cover the actual cost <br />of construction, may allocate to the project constructed by it, under cantract or otherwise, <br />such amounts as may be determined by it for investigating, engineering, inspection, and <br />other expenses and may provide for the repayment of the same out of the first moneys <br />repayable from the project under the contract far its construction, and such maneys so <br /> <br />.f" <br /> <br /> <br />r <br />. <br />) <br />j <br />. <br />. <br />. <br />i <br />!, :,,'. <br />,. <br />f <br />1 <br /> <br />; <br /> <br /> <br />..... <br />.J <br /> <br />"'.,:." <br /> <br /> <br />. <br />