Laserfiche WebLink
<br />- 2- <br /> <br />remaining 2004 meetings with the addition of May 27, 2004 to <br />the May meeting in Alamosa, Colorado. Motion was approved <br />8-0. Ray Wright and Russell George were not present. <br /> <br />2. Stream and Lake Protection - ISF Rulemaking, Rule 6g-Selection of Hearing Date, <br />Time and Place <br />Tape 1, Track 1 14:25 - 18:07 <br />Action: A motion was made by Greg Hoskin with a second by Keith Catlin to accept <br />staff recommendation to schedule this hearing for March 16,2004 at 4:00 <br />p.m. in Colorado Springs, Colorado. Felicity Hannay was appointed as <br />Hearing Officer and Dan McAuliffe was appointed as Alternate Hearing <br />Officer. Motion was approved 8-0. Ray Wright and Russell George were not <br />present. <br /> <br />3. Review and Approval of Meeting Minutes <br />Tape 1, Track 1 18:07-18:45 <br />a. November 19 - 21, 2003 <br />Action: This item was moved to the March 16-17, 2004 meeting in Colorado Springs, <br />Colorado. <br /> <br />4. Approve and/or remove items from Consent Agenda Items <br />Tape 1, Track 1 18:45-19:48 <br />Action: A motion was made by Carolyn McIntosh with a second by Don Schwindt to <br />accept the Consent Agenda items as presented. Motion was approved 8-0. <br />Ray Wright and Russell George were not present. <br /> <br />5. Flood Protection Section - Colorado Floodplain and Stormwater Criteria Manual <br />Tape 1, Track 1 19:48-48:53 <br />Action: Information item, no formal action taken. <br />a. Instruction #7: Stormwater Runoff Detention <br />b. Instruction #8: Flood Conveyance within Irrigation Ditches/Canals <br />c. Instruction #9: Floodplain Development Practices <br /> <br />6. Flood Protection - South Platte Downstream Channel Improvement Project - Semper <br />Development Easement Request <br />Tape 1, Track 1 48:53-1:01:44 <br />Action: A motion was made by Harold Miskel with a second by Russell George to <br />accept staff recommendation to approve the construction easement and non- <br />exclusive easement request for the sidewalk project for Semper Development <br />Ltd. On the CWCB right-of-way under Method III fee considerations. <br />Authorize staff to prepare the necessary easement documents and the Director <br />to execute said documents. It should be further recommended that the grantee <br />should replace and reclaim all existing easement/project features. Motion was <br />approved 9-0. Ray Wright was not present. <br /> <br />7. Legislative Review <br />Tape 1, Track 1 1:01:44-1:29:39 <br />Action: Information item. No formal action taken. <br /> <br />Flood Protection. Water Project Planning and Finance. Stream and Lake Protection <br />Water Supply Protection. Conservation Planning <br />