My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD01841
CWCB
>
Board Meetings
>
Backfile
>
2001-3000
>
BOARD01841
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 3:07:55 PM
Creation date
10/4/2006 7:03:35 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
1/26/2000
Description
CF Section - New Loans - Weld County Tri-Area Sanitation District - Stormwater Detention Facility
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />SUMMARY OF PROPOSED PROJECT <br />WELD COUNTY TRI-AREA SANITATION DISTRICT <br />STORMW A TER DETENTION FACILITY <br /> <br />. <br /> <br />Proiect SDonsor: Weld County Tri-Area Sanitation District <br /> <br />TVDe of Proiect: Municipal- drainage and flood control <br /> <br />Location: Immediately south of Frederick at the intersection of 8th Street and Weld <br />County Road 13 and about Y:z mile north of Colorado Highway 52 in Weld County. <br /> <br />Date of ADDlication: October 28,1998 and January 24,2000 <br /> <br />Feasibility Studv: Submitted January 2000 by the Sear-Brown Group of Fort Collins <br /> <br />Proiect DescriDtion: The District is proposing a regional detention pond project that will <br />reduce the peak historic flows in the Tri- Town Drainageway and thereby reduce the <br />extent of flooding in .the communities of Evanston, Firestone and Frederick. The pond <br />will be located on 60 acres of agricultural land immediately south of Frederick as shown <br />on the attached site map. It will have the capacity to store 146 acre-feet during the 100- <br />year storm event. Maximum inflow to the pond during the 100-year storm event will be <br />about 2,000 cubic feet per second (cfs) and the pond will be designed for a maximum <br />release rate of 567 cfs thus providing significant attenuation of the peak discharge. The <br />pond is designed to drain in about 40 hours and the project site will be used for open <br />space and recreational purposes when the pond is empty. The pond will also serve to <br />. reduce the volume of pollution from storm water runoffby providing detention and <br />settling of runoff. <br /> <br />. <br /> <br />Estimated Proiect Cost: $2,065,478 <br /> <br />Fundinl! Requested: $730,000 in 2000 and $770,000 in 2010 <br /> <br />. <br />
The URL can be used to link to this page
Your browser does not support the video tag.