My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD01841
CWCB
>
Board Meetings
>
Backfile
>
2001-3000
>
BOARD01841
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 3:07:55 PM
Creation date
10/4/2006 7:03:35 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
1/26/2000
Description
CF Section - New Loans - Weld County Tri-Area Sanitation District - Stormwater Detention Facility
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />The pond is designed to drain in about 40 hours and the project site will be used for open <br />space and recreational purposes when the pond is empty. The pond will also serve to <br />reduce the volume of pollution from stormwater runoff by providing detention and <br />settling of runoff. The pond design will incorporate National Pollution Discharge <br />Elimination System permit requirements for best management practices. <br /> <br />An NPDES permit will be required from the Colorado Department of Health. The project <br />will not require a Corps of Engineers 404 Permit. <br /> <br />The total cost of the project is estimated at about $2,0 million as shown in Table 2. The <br />net cost of the project to the District will be $1,715,500 since the Town of Frederick will <br />contribute the land component. The District intends to undertake and complete <br />construction in 2001. <br /> <br />Table 2. Regional DeteJ1tion Pond Cost Summary <br /> <br />Item Estimated Cost <br />Construction cost with 20 % contingency $1,491,720 <br />Design, surveying and construction engineering $223,758 <br />Estimated land purchase $350,000 <br />Total $2,065,478 <br /> <br />Financial SummafV <br /> <br />. <br /> <br />The District's financial condition appears to be sound as of the end of 1998. Table 3 <br />summarizes some key financial indicators based on information in the District's audit <br />reports for the years 1996 to 1998. All of the indicators in Table 4 are in the strong or <br />acceptable categories per the Board's creditworthiness policy with the exception of debt <br />service in 1996 and 1997. In the last few years, the District has used tap fee revenues to <br />essentially eliminate debt and build up substantial cash reserves. <br /> <br />Table 3. WCTASD Financial Indicators <br /> <br />Item 1998 1997 1996 <br />Operating Ratio (1) 0.97 1.04 0.96 <br />Debt Service Coverage w/o tap fees (2) 1,24 Inadequate Inadequate <br />Debt per Tap $43 $63 $301 <br />Cash Reserves to Current Expense 2.05 1.53 2.67 <br /> <br />(I) Operating revenue/( operating expense-depreciation) <br />(2) (Revenue-operating expense-depreciation)/debt service <br /> <br />. <br /> <br />The District's storm water enterprise fund, established in 1999, is the entity that would <br />have primary responsibility for repayment of a project loan. The enterprise currently <br />assesses a service charge of $4.00 per month on each ofthe 1,185 taps in the District. The <br />enterprise fund will have a cash reserve of about $100,000 by the end of this year. <br /> <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.