My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD01838
CWCB
>
Board Meetings
>
Backfile
>
2001-3000
>
BOARD01838
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 3:07:53 PM
Creation date
10/4/2006 7:03:34 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
1/27/1999
Description
CF Section - New Loans - Consolidated Mutual Water Co. - Fortune Reservoir
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />SUMMARY OF PROPOSED PROJECT <br />CONSOLIDATED MUTUAL WATER COMPANY <br />FORTUNE RESERVOIR <br /> <br />. Project Sponsor: Consolidated Mutual Water Company <br /> <br />Type of Project: Municipal- new raw water reservoir <br /> <br />Location: About \/2 mile northwest of the intersection of Highway 72 and Indiana Street <br />on a dry tributary of Big Dry Creek in the City of Arvada, Jefferson County as shown on <br />the attached map. <br /> <br />Date of Application: December 22, 1998 <br /> <br />Feasibility Study: First draft received December 22, 1998 <br /> <br />Project Description: The project involves the construction of a 9,000 acre-foot reservoir <br />with a 105 foot-high, zoned earth embankment; an emergency spillway capable of <br />passing the Probable Maximum Flood; and a 30-inch diameter inlet/outlet pipeline. The <br />reservoir will be hydraulically connected with the rest of the Company's Maple Grove <br />raw water system through 5 \/2 miles of new pipeline. Geotechnical and hydrologic <br />investigations as well as final project design have been completed. The State Engineers <br />Office is currently reviewing the design documents. <br /> <br />Estimated Project Cost: $21,585,000 <br /> <br />. ReQuested Loan: $10,000,000 (about 50 percent of total project costs) <br /> <br />Aerial Photo of Fortune Reservoir Site <br /> <br />- <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.