My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD01838
CWCB
>
Board Meetings
>
Backfile
>
2001-3000
>
BOARD01838
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 3:07:53 PM
Creation date
10/4/2006 7:03:34 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
1/27/1999
Description
CF Section - New Loans - Consolidated Mutual Water Co. - Fortune Reservoir
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />e <br /> <br />e <br /> <br />e <br /> <br />Colorado Water Conservation Board <br />Department of Natural Resources <br />721 Centennial Building <br />1313 Sherman Street <br />Denver, Colorado B0203 <br />Phone: (3031866-3441 <br />FAX: (303) 866-4474 <br /> <br />STATE OF COLORADO <br /> <br />- <br /> <br />Bill Owens <br />Governor <br /> <br />Greg E. Walcher <br />Executive Director, DNR <br /> <br />MEMORANDUM <br /> <br />Peter H. Evans <br />Acting Director, CWCB <br /> <br />TO: <br /> <br />Colorado Water Conservation Board Members f(!. <br /> <br />Bill Stanton, P.E., Chief, Project Plann~}DY Construction Section'f . <br />Bill Green, P.E., Manager ofPlanninlY" IX" <br /> <br />FROM: <br /> <br />DATE: <br /> <br />January 22,1999 <br /> <br />SUBJECT: <br /> <br />Agenda Item 13d., January 27-28,1999 Board Meeting - Water <br />Project Construction Loan Program - New Loans - Consolidated <br />Mutual Water Co. - Fortune Reservoir <br /> <br />Introduction <br /> <br />The Board will be asked to approve a Construction Fund loan of$lO,OOO,OOO to the <br />Consolidated Mutual Water Company of Lakewood for the construction of a new raw <br />water reservoir. Please see the attached project summary, maps and a letter from Walter <br />Welton, the President ofthe Company. <br /> <br />Backl!round <br /> <br />Consolidated submitted a loan application and a draft feasibility study along with a <br />number of other documents on December 22, 1998 for the Fortune Reservoir Project. <br />Geotechnical and hydrologic investigations as well as a final project design have been <br />completed. The State Engineer's Office is currently reviewing the design submittal by <br />Tuttle Applegate of Denver. <br /> <br />Staff review of the draft feasibility study indicates that there remains a substantial amount <br />of work to be done to satisfactorily complete the study. Staff will recommend that any <br />loan approval be conditioned upon the completion and acceptance of a full feasibility <br />study, which meets the requirements ofthe CWCB Construction Fund Guidelines. <br /> <br />Proiect Sponsor and Facilities <br /> <br />The Consolidated Mutual Water Company is a mutually owned, non-profit corporation, <br />The Company's service area includes unincorporated areas of Jefferson County as well as <br />
The URL can be used to link to this page
Your browser does not support the video tag.