My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD01814
CWCB
>
Board Meetings
>
Backfile
>
2001-3000
>
BOARD01814
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 3:07:35 PM
Creation date
10/4/2006 7:02:53 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
3/16/2004
Description
CF Section - New Loans - Union Ditch Company - Well Augmentation/Recharge Project
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />, <br /> <br />UniOn OItch Company <br />Mard11i).17,2004 <br /> <br />Agenda Item 25f <br /> <br />, <br />. <br /> <br />Water Project Construction Loan Program-Project Data <br /> <br />. <br /> <br />Borrower: Union Ditch Company (UDC) <br /> <br />County: Weld <br /> <br />Project Name: UDC Recharge Project <br /> <br />Project Type: Well Augmentation <br /> <br />Drainage Basin: South Platte <br /> <br />Water Source: South Platte River <br /> <br />Total Project Cost: $344,000 <br /> <br />Funding Sources: ewes, uac <br /> <br />Type of Borrower: Agricultural <br /> <br />Aver. Delivery: 206 acre-feet (consump. use) <br /> <br />ewes Construction Fund Loan: $309,500 <br /> <br />Interest Rate: 2.50% <br /> <br />Term: 30 years <br /> <br />UDC operates the Union Ditch providing direct flow irrigation water to an area of S,SOo-acres east of <br />the Town of laSalle and south of Greeley. Water is diverted from the South Platte River at a headgate <br />east of the Town of Milliken. UDC operates approximately 15 miles of ditch and typically delivers <br />about 29,000 acre-feet of irrigation water per year. UDC has filed an application for an <br />Augmentation Plan to provide replacement water for 40 junior wells owned by shareholders, <br />formerly serviced by GASP, to replace Qut-of-priority irrigation well depletions. As part of the <br />Augmentation Plan UDC will need 50 AF of developed recharge storage capacity to offset the <br />depletions. The project involves the development of three recharge structures, with the top priority <br />site, the Mecure #1 Site (20 AF) developed initially in 2004, and the remaining two sites totaling 30 <br />AF developed in 2005. Each pond would be filled by water that is diverted from the Union Ditch. <br />The construction of each site will include pond excavation, flow measurement structures (flumes on . <br />feeder canals or meters for pumps), headgate structures for feeder canals, and monitoring and <br />reporting measurement equipment (SCADA). The ponds will be relatively shallow in depth (< 10 <br />feet) and will include an earthen embankment around the perimeter of the pond. <br /> <br /> <br />. <br />," <br />_.3-<.1;' <br />~"1 <br /> <br />-. <br /> <br />:,','..1 <br /> <br />.. <br /> <br />.. <br /> <br />"'. <br /> <br />.. <br /> <br />, <br />_c' <br />. <br /> <br />"' . <br /> <br />. , <br />'-' . <br />1\'-'. <br />, <br /> <br />-1 <br /> <br />. .~~ <br />. ...... <br />Project ~,_ <br />L ' , <br />ocatlOn ' <br /> <br />1,.- <br /> <br />- <br /> <br />.. <br /> <br />" <br /> <br />.~~A r <br />;~""" <br /> <br />,-- <br />, <br />, .. <br /> <br />. <br />I :>' <br /> <br />. <br /> <br />. <br /> <br />.. <br /> <br />-. <br /> <br />. <br />, <br />.'- <br />- <br />", <br /> <br />: , <br /> <br />. <br />. <br /> <br />- <br /> <br />. <br />. <br /> <br />.. <br /> <br />. <br /> <br />:; <br /> <br />. <br /> <br />~ <br /> <br />Location Map <br /> <br />Page 6 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.