Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />. <br /> <br />SUMMARY OF CLOSED BASIN PROJECT OPERATIONS <br /> <br /> RIO GRANDE COMPACT OTHER TOTAL <br />YEAR MITIGATION DELIVERIES [AF] DELIVERIES [AF] PUMPING PUMPED REMARKS <br /> Blanca Alamosa Adjust for subtotal Not subtotal <br />[calender WHA NWR exchanges mitigation Creditable creditable compact <br />1985 40 40 test pumping began 9/85. deliveries began 10/18/85 <br />1986 892 2,879 92 3,679 24 24 0 3,703 compact delivery for testing only <br />1987 860 6,077 1,637 5,300 894 894 0 6,194 compact delivery for testing only <br />1988 1,785 3,654 985 4.454 11,772 11,772 8,202 24.428 compact delivery for testing only <br />1989 1,390 1,950 590 2,750 17,340 5,780 23,120 4,709 30,579 Blanca includes 633 AF of test water <br />1990 800 1,950 0 2,750 15,750 1,620 17,370 8,220 28,340 <br />1991 940 1,940 140 2,740 17,130 510 17,640 6,899 27,279 <br />1992 1,250 3,100 450 3,900 17,130 0 17,130 3,160 24,190 Blanca includes 450 AF of CDOW exchange water <br />1993 1,600 4,360 800 5,160 31,380 0 31,380 2,590 39,130 Blanca includes 800 AF of CDOW exchange water <br />1994 1,570 4,500 770 5,300 18,250 10 18,260 1,168 24,728 Blanca includes 790 AF of CDOW exchange water <br />1995 2,700 4,500 1,900 5,300 10,180 3,960 14,140 1,531 20,971 Blanca includes 1200 AF flood control, 400 AF test water, and <br /> 300 AF DOW exchange <br />1996 1,010 4,500 210 5,300 22,830 . 0 22,830 2,967 31,097 Blanca includes 210 AF DOW exchange <br />1997 1,513 3,262 715 4,060 38,997 0 38,997 1.466 44,523 Blanca includes 713 AF DOW exchange <br /> <br />NOTES: 1, Data from USBR Water Acounting Report, USBR Annual Operating Plan, or USBR Report to Rio <br />Grande Compact Comm,; adjusted by USBR Alamosa Projects Office, <br />2, Delivery at Lobatos is not creditable if salinity exceeds level specified in Article III of Compact. <br />3, Other pumping includes operational losses and deliveries to Head & San Luis Lakes <br /> <br />05106198, C:\SRMtLLERIRrOGRAND\CBP _OPERWB2 <br />