My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD01810
CWCB
>
Board Meetings
>
Backfile
>
2001-3000
>
BOARD01810
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 3:07:29 PM
Creation date
10/4/2006 7:02:31 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
5/22/1995
Description
Agenda or Table of Contents, Minutes, Memos
Board Meetings - Doc Type
Meeting
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
412
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />, <br /> <br />. <br /> <br />engineer, for the fiscal year beginning July 1, 1995, the sum of <br />one hundred thirteen thousand dollars ($113,000), or so much <br />thereof as may be necessary, for the maintenance of the satellite <br />monitori ng system establ i shed and operated pursuant to sect i on <br />37-80-102 (10), Colorado Revised Statutes. ' <br /> <br />SECTION 5. Purgatoire River Transit Loss Investigation - <br />appropriation. The Colorado water conservation board is hereby <br />authorized to expend up to sixty thousand dollars ($60,000) from <br />the Colorado water conservati on board construct ion fund for an <br />investigation and assessment of transit times and losses <br />associated with releases of water from the Trinidad Reservoir in <br />and along the Purgatoire River to its confluence with the Arkansas <br />River and related expenses. <br /> <br />SECTION 6. Rio Grande Project Operation Assessment - <br />appropriation. The Colorado water conservation board is hereby <br />authori zed to expend up to seventy-fi ve thousand dollars ($75,000) <br />from the Colorado water conservation board construction fund to <br />participate in and support the collection and evaluation of data <br />concerning operation. of the Rio Grande Project, and the <br />preparation of recommendations for its future operation. <br /> <br />. <br /> <br />SECTION 7. Small Dam Site Reconnaissance Program - <br />continuation. The Colorado water conservation board is hereby <br />authori zed to cont i nue its fi e 1 d reconnai ssance study of potent i a 1 <br />small dam sites in Colorado and to increase the level of technical <br />assistance available to small organizations interested in <br />constructing small new storage facilities and for rehabilitation <br />or enlarging existing facilities. For such purposes, the Colorado <br />water conservation board is also authorized to contract for <br />serv ices and to expend not more than fi fty thousand dollars <br />($50,000) from the Colorado water conservation board construction <br />fund. <br /> <br />SECTION 8. Section 1 (1) (a) of chapter 405, Session Laws <br />of Colorado 1983, as amended by section 4 of chapter 230, Session <br />Laws of Colorado 1986, as amended by section 2 of chapter 32, <br />Session Laws of Colorado 1987, is further amended to read: <br /> <br />Section 1. Project authorizations. (1) (a) Pursuant to <br />section 37-60-122 (1) (b), Colorado Revised Statutes, the Colorado <br />water conservation board is hereby authorized to construct, or <br />cause to be constructed, the following water resources projects: <br /> <br /> Repayment <br /> Project Board Period Total <br /> Priority Name Cost (Years) Repayment <br /> 1.* Dolores $ 7,000,000 40 $16,318,400 <br />. 2. Buckeye <br />PAGE 5-HOUSE BILL 95-1155 <br />
The URL can be used to link to this page
Your browser does not support the video tag.