<br />Approval of Minutes, ';- " .
<br />Tape 1, Start/Stop: 0150 - 0152 ,--' ,___,,_~e,.
<br />Action: There were no corrections to the minutes. A motion waS inlIde,!>y'DliYid' -
<br />Smith to approve these minutes. The motion was seconded by Alan-HameL, ..
<br />and was approved unanimously (9-0). ,
<br />
<br />3. Directors' Reports - ewCB, DOW, SEO, AG,
<br />Tape 1, Start/Stop: " '., , 'j<[ " Ie'. , ';OI:S3"1!'i~38
<br />Action: Reports from CWCB, SEO, and DOW were heard. The items from the
<br />AGs office would be given~diliing the Executive Session. A verbal report
<br />by Dan Law of the Colorado Water ResourceS Power and Development
<br />Authority was given. David Harrison made a motion{that the-Board,accept
<br />the Resolution on Reclamation Reform Act/Conservation Guidelim;s:-The
<br />motion was seconded by Ray WeIDer and approvedlllnanlmously'(9-0).
<br />
<br />4.
<br />
<br />4a.
<br />
<br />Floodplain Designation ApprovaIsand'Standards .
<br />...... ' :.~~ .:,'~;I.f:" .:.:~.\
<br />
<br />..I. . -;:.. ,
<br />
<br />-. , " ~ . .' ~f:;'?
<br />
<br />Approval of the Designation Pro~edu~e1Standard~ for Approxinlate Floodplains
<br />(Groups ill and IV) .;- ,
<br />Tape 1, Start/Stop:" 1443.~ 1845 ' '."
<br />Action: A motion was made by"Eric Kuhn that .the Board' accept. the staff
<br />recOmmendation to approve the' regional regressibn methodology:described
<br />in the memorandum as suitable for Board approval and designation of 100-
<br />year floodplain information that is prepared using the methodology, to
<br />authorize the Board staff and the CWCB Hydrology Advisory Committee
<br />to proceed with the preparation of the Guidelines and to approve the
<br />proposed order of study for Colorado's river basins, with the Arkansas,
<br />South Platte and Republican River basins as first study priorities. The
<br />motion was seconded by Ray WeIDer and approved unanimously (9-0).
<br />
<br />e
<br />
<br />4b. 45 Day Notice for the Review and Approval of the ,Approximate Floodplains as
<br />Delineated in the Report entitled "Floodplain Information Report, Volumes I, II, ill,
<br />and N, for the Colorado, Gunnison, White, and Yampa Rivers, Dated March,
<br />1995."
<br />Tape 1, Start/Stop: 1850 - 2100
<br />Action: A motion was made by Eric Kuhn that the Board accept the staff
<br />recommendation to notify all of the affected local governnlents, as listed
<br />in the Board memorandum, of its intent to consider all approval and
<br />designation as approximate 1 DO-year floodplains the information presented
<br />in subject study, and to'direCt the staff to prepare ietters of notification of
<br />the proposed designation and approval action on behalf of the Chair of the
<br />Board, such letter to be mailed no less than 45 days priodo the July 1995