My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD01809
CWCB
>
Board Meetings
>
Backfile
>
2001-3000
>
BOARD01809
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 3:07:14 PM
Creation date
10/4/2006 7:02:31 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
11/22/1999
Description
Summary Minutes and Record of Decisions - November 22-23, 1999
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Tape 3, Start/Stop: 0001 - 0373 <br />Action: A motion was made by Lewis Entz to accept the staff recommendation to <br />approve $120,000 for continuation of this project, with the intent to <br />support the Department's pursuing the additional funding requested by the <br />Sate Engineer's Office. The motion was seconded by Patricia Wells and <br />approved unanimously (9-0). <br /> <br />15b. Water Supply Planning and Finance - Non-Reimbursable Projects - Closed Basin <br />Project - Land Acquisition Addition Funds <br />Tape 3, Start/Stop: 0373 - 0605 <br />Action: A motion was made by Lewis Entz to accept the staff recommendation to <br />approve an increase to this appropriation by $188,000, and that a clause be <br />specifically added to the appropriation that the amount appropriated may <br />be increased or decreased as may be justified by reasons of changes made <br />in the project plans if those changes are required by final engineering <br />drawing and specification or by Federal or State Requirements. The <br />motion was amended to include that the staff and Attorney General's <br />Office would work on the language in the biII to give the General <br />Assembly a better understanding of the nature of the project. The motion <br />was seconded by David Smith arid approved unanimously (9-0). <br /> <br />lSc. Water Supply Planning and Finance - Non-Reimbursable Projects - North Fork <br />River Improvement Assoc. - Multi-Objective Planning Study <br />Tape 3, Start/Stop: 0605 - 1527 <br />Action: A motion was made by Eric Kuhn to accept staff recommendation to <br />approve a grant in the amount of$55,000, of which $50,000 is designated <br />for funding of the Paonia Reservoir Research Project, and $5,000 for the <br />Association's costs of administering the Project. The motion was <br />seconded by Greg Walcher and approved unanimously (10-0), <br /> <br />lSd. Water Supply Planning and Finance - Non-Reimbursable Projects - AIamosa/La Jara <br />Water Conservancy district - AIamosa River Multi-Objective Study <br />Tape 3, Start/Stop: 0000 - 0000 <br />Action: This item was deleted from the agenda. <br /> <br />lSe. Water Supply Planning and Finance - Non-Reimbursable Projects - Mesa <br />County/Grand Jet. Drainage District - 80sIey Wash Feasi;'i1ity Study <br />Tape I, Start/Stop: 1530 - 2366 <br />Action: A motion was made by Patricia Wells to accept staff recommendation for <br />up to $75,000 from the Construction Fund, with $50,000 for the <br />Feasibility Study and a demonstration project for $25,000. The motion <br />was seconded by Eric Kuhn and approved unanimously (10-0). <br /> <br />lSf. Water Supply Planning and Finance - Non-Reimbursable Projects - Douglas County <br />Water Authority- South Metropolitan Water Supply Study <br /> <br />Minutes Novem1:>er 22-23, 1999 <br />Page 10 <br /> <br />~ <br /> <br />~<< <br />f"'" <br />""f.'" <br /> <br />(-. <br />.....:,;. <br />~~, '. <br />.:--~ <br /> <br />t'\ <br />",-,. <br />
The URL can be used to link to this page
Your browser does not support the video tag.