Laserfiche WebLink
<br /> TABLE 1. BIG WINDSOR RESERVOIR PUMPING STATION CONSTRUCTION COSYS <br />. OPTION #1. ELECTRICAL POWER - 14,700 ACRE FEET/YEAR <br /> 1. CONCRETE INLET STRUCTURE $7,500 <br /> 2. 550' 60-INCH DIAMETER RCP $220,000 <br /> 3. TWO 600 HP PUMPS W/ ELECTIC MOTORS $512,500 <br /> 4. CONCRETE WELL STRUCTURE $121,250 <br /> 5. 250' OUTLET PIPELINE $75,000 <br /> 6. OUTLET STRUCTURE @ DITCH $9,000 <br /> 7. ELECTRICAL SERVICE $26,000 <br /> 8. ENGINEERING, LEGAL, CONTINGENCIES $283,575 <br /> $1,254,825 <br /> OPTION #2. ELECTICAL POWER - 7,600 ACRE FEET/YEAR <br /> l. CONCRETE INLET STRUCTURE $7,500 <br /> 2. 550' 48-lNCH DIAMETER RCP $165,000 <br /> 3. TWO 300 HP PUMPS W/ ELECTIC MOTORS $318,750 <br /> 4. CONCRETE WELL STRUCTURE $121,250 <br /> 5. 250' OUTLET PIPELINE $62,500 <br /> 6. OUTLET STRUCTURE @ DITCH $9,000 <br /> 7. ELECTRICAL SERVICE $26,000 <br /> 8. ENGINEERING, LEGAL, CONTINGENCIES $205,200 <br />. $915,200 <br /> OPTION #3. DIESEL POWER - 14,700 ACRE FEET/YEAR <br /> l. CONCRETE INLET STRUCTURE $7,500 <br /> 2. 550' 60-INCH DIAMETER RCP $220,000 <br /> 3. TWO 600 HP PUMPS W/ DIESEL ENGINES $517,000 <br /> 4. CONCRETE WELL STRUCTURE $121,250 <br /> 5. 250' OUTLET PIPELINE $75,000 <br /> 6. OUTLET STRUCTURE @ DITCH $9,000 <br /> 7. ENGINEERING, LEGAL, CONTINGENCIES $283,575 <br /> $1,233,325 <br /> <br />. <br /> <br />OPTION #4. DIESEL POWER -7,600 ACRE FEET/YEAR <br /> <br />I. CONCRETE INLET STRUCTURE <br />2. 550' 48-INCH DIAMETER RCP <br />3. TWO 300 HP PUMPS W/ DIESEL ENGINES <br />4. CONCRETE WELL STRUCTURE <br />5. 250' OUTLET PIPELINE <br />6. OUTLET STRUCTURE@ DITCH <br />7. ENGINEERING, LEGAL, CONTINGENCIES <br /> <br />$7,500 <br />$165,000 <br />$299,000 <br />$121,250 <br />$62,500 <br />$9,000 <br />$199,275 <br />$863,525 <br />