My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD01792
CWCB
>
Chatfield Mitigation
>
Board Meetings
>
Backfile
>
1001-2000
>
BOARD01792
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 3:07:03 PM
Creation date
10/4/2006 7:02:16 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
3/4/1993
Description
Agenda or Table of Contents, Minutes, Memos. Partial.
Board Meetings - Doc Type
Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
140
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />~: <br /> <br />( <br /> <br />. <br /> <br />e <br /> <br />e <br /> <br />STATE OF COLORADO <br /> <br />COLORADO WATER CONSERVATION BOARD <br />Department of Natural Resources <br /> <br />. <br /> <br />721 SIal. CanI_ Buidlng <br />1313 Sharman_ <br />Danwt.~ 80203 <br />_(303)_' <br />FAX (303) -"'74 <br /> <br />Floy- <br />_mar <br /> <br />MEMORANDUM <br /> <br />-- <br />Ex__.DNR <br /> <br />lleJiuC. LIe. P.e. <br />Oir8t:lot. ewes <br /> <br />TO: Members, CWCB <br /> <br />FROM: Dan Merriman <br /> <br />DATE: February 25, 1993 <br /> <br />SUBJECT: Agenda Item 12h, MarGh 4-5, 1993, Board Meeting-- <br />Instream Flow Program: Statements of Opposition <br />Case No. 5-92CW291; Upper Eagle Regional Water Authority, and Avon, <br />Eagle-Vail, Edwards, Arrowhead, and Berry Creek Metropolitan Districts <br /> <br />Application SummaI)' <br /> <br />This is an application to amend plans for augmentation on the Eagle River near <br />Avon in Eagle County (see attached map). The five Metro Districts listed above have each <br />adjudicated separate plans for augmentation which contemplated releases of wintertime <br />augmentation from various Eagle River basin storage locations. Since that time, the Upper <br />Eagle Regional Water Authority (UERWA) has contracted with the Bureau of Reclamation <br />for the release of 320 AF from Green Mountain Reservoir. The applicants are now <br />proposing to amend their existing augmentation plans to allow replacement of their <br />aggregate, out-of-priority depletions with releases of UERWA's Green Mountain storage <br />water. <br /> <br />CWCB Appropriations <br /> <br />The Board has the following instream flow decrees which could be injured by this <br />application: <br /> <br />Case No. <br /> <br />Stream <br /> <br />Amount (cfs) <br /> <br />Approp. Date <br /> <br />5-80CW134 <br />5-80CW126 <br />5-80CW124 <br /> <br />Eagle River <br />Eagle River <br />Eagle River <br /> <br />85/35 <br />110/45 <br />130/50 <br /> <br />3/17/80 <br />3/17/80 <br />3/17/80 <br />
The URL can be used to link to this page
Your browser does not support the video tag.