My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD01778
CWCB
>
Board Meetings
>
Backfile
>
1001-2000
>
BOARD01778
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2015 11:51:17 AM
Creation date
10/4/2006 7:02:08 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
11/20/2000
Description
Directors' Reports
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
127
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />,- <br /> <br />. <br /> <br />Director's Report Attachment - November 20-21, 2000, Board Meeting <br />Water Supply Planning and Finance Section <br />Design and Construction Status Report <br /> <br />The CWCB Water Supply Planning and Finance Section has completed 4 projects in FY 00-01. Currently we <br />have II projects under construction and 14 projects in the design phase. <br /> <br />The attached spreadsheet summarizes project status including budget, construction schedule, and progress to <br />date. During this current reporting period I project was completed. <br /> <br />The attached progress report briefly outlines all active project design and construction information and progress <br />to date. <br /> <br />Projects Under Construction <br /> <br />1. Excelsior Irrigating Company - Excelsior Ditch Rehabilitation <br />Authorization: SB 97-008 County: Pueblo - E of Pueblo <br />Water Source: Arkansas River Project Yield: 4,250 ac.fl. <br />Terms of Loan: $251,125 @ 3.75% for 30 yrs Project Type: Ditch Rehabilitation <br /> <br />This $335,000 project is the re-construction of approximately 2 miles of open ditch, which has previously been <br />abandoned and farmed over. Also included in the project is the construction of scveral pump stations for water delivery. <br />The project is located in Pueblo County 10 miles east of Pueblo. Project design was prepared by the Pueblo Office of the <br />Natural Resource Conservation Service, Ralph Adkins, P.E. of Pueblo, Irrigation Engineering of Alamosa and Hendrooke <br />. Sprinklers of FI. Collins. Project construction commenced by the owner and several sub-contractors in May 1998 and <br />was originally scheduled for completion in the fall of 1999. Flooding damaged the project area during the summer of <br />1999 that has delayed the project's completion schedule ttntil the December of 2000. <br /> <br />2. Model Land and Reservoir Company - Model Reservoir Dam Rehabilitation <br />Attthorization: Emergency Infrastr. Repair Account County: Jefferson - NW of Arvada <br />Water Source: Purgatoire River Project Yield: 6,000 ac.fl. <br />Terms of Loan: $335,000 @3.75%for30years Project Type: Dam Rehabilitation <br /> <br />In May of 1999 a flood event originating in the local basin overtopped thc existing outlet conduit, damaging the <br />outlet gate tower, the dam embankment, and causing downstream property damage. The proposed project to resolve the <br />emergency situation consists of constructing a new outlet tower and conduit. repairing the dam embankment, the <br />construction of a concrete parapet wall, and the installation of water level and discharge rccording devices. The final <br />design plans were completed by URS Greiner, Denver, CO, and are currently under final review at the State Engineer's <br />Office. The project was awarded to TLM Construction, from Swink, CO, who commenced construction in January 2000 <br />and have completed the work. Project substantial completion is pending, until final review and approval is received by <br />the State Engineer's Office, the loan contract is complete and final payment request and project advertisement has been <br />received from the owner. Project substantial completion is anticipated in December of 2000. <br /> <br />3. Otero Ditch Company - Diversion Structure Rehabilitation <br />Authorization: SB County: Otero - N.W. of Fowler <br />Water Source: Arkansas River Project Yield: 20,687 ac.ft. <br />Terms of Loan: $155,000 @ 4.0% for 30 yrs Project Type: Diversion Structure <br /> <br />. <br /> <br />The Otero Ditch Company diverts water directly from the Arkansas River approximately I mile northwest of the <br />Town of Fowler. The existing diversion structure and right abtttment were washed out during flooding in April and May <br />of 1999. This $620,000 project involves stabilizing 2000 l.f. of streambank, the construction of a I 82-ft. long concrete <br />
The URL can be used to link to this page
Your browser does not support the video tag.