My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Board Meeting 05/20/2002
CWCB
>
Board Meetings
>
Backfile
>
1001-2000
>
Board Meeting 05/20/2002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 3:06:48 PM
Creation date
10/4/2006 7:02:03 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
5/20/2002
Description
Agenda
Board Meetings - Doc Type
Agenda
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />-4 - <br /> <br />a, City of Pueblo, Case No, 2-01CW160, The StafJwill request that the Board take <br />action on the requests for party status that were filed after the dealine had passed. <br /> <br />b, City of Longmont, Case No, 1-01CW275, The hearing process for the application <br />has been stayed until 90 days after the Supreme Court renders it's decision in the <br />Golden Appeal. <br /> <br />c, Upper Gunnison Water Conservancy District, Case No, 4-02CW38, The stafJwill <br />request that the Board appoint a Hearing Coordinator and authorize the StafJ to file a <br />motion to delay the deadlines for filing the Board's findings of fact and <br />recommendations. <br /> <br />21. Flood Protection Program (11:15 -12:15) <br />a, Floodplain Designation Update <br />b, Technical Document Approval <br />c, South Platte River Easement Request-Echo Star Satellite System <br /> <br />Lunch 12:15 -1:15 <br /> <br />22, Colorado River Basin Issues (1: 15 - 2:45) <br />a, Colorado River (Mainstream) Basin Director's Report <br />b, Y ampa- White River Basin Director's Report <br />c, San Juan/San Miguel-Dolores River Basin Director's Report <br />d, Gunnison River Basin Director's Report <br />e, Colorado River Annual Operating Plan /Glen Canyon Adaptive Management <br />Program <br />f, Ruedi Reservoir - Long Term Contract for Endangered Fish Water <br />g, Navajo-Gallup <br />h, Upper Colorado River Recovery Program - Extending the Program <br /> <br />23, Platte River Basin Issues (2:45 - 3:30) <br />a, Denver Director's Report <br />b, North Platte River Basin Director's Report <br />c, South Platte River Basin Director's Report <br />d, Platte River Cooperative Agreement Status and Update <br />e, Tamarack Project - Memorandum of Understanding for Operations <br /> <br />24, Rio Grande Basin Issues (3 :30 - 3 :40) <br />a, Rio Grande Basin Director's Report <br /> <br />25, Arkansas River Basin Issues (3:40 - 4:00) <br />a, Arkansas River Basin Director's Report <br />b, Status Report on Proposed Water Banking Rules <br /> <br />Flood Protection. Water Supply Planning and Finance. Stream and Lake Protection <br />Water Supply Protection. Conservation and Drought Planning <br />
The URL can be used to link to this page
Your browser does not support the video tag.