My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD01751
CWCB
>
Board Meetings
>
Backfile
>
1001-2000
>
BOARD01751
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 3:06:37 PM
Creation date
10/4/2006 7:01:53 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
5/11/1998
Description
Summary Minutes and Record of Decisions - May 11-12, 1998
Board Meetings - Doc Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />e <br /> <br />e <br /> <br />e <br /> <br />5ai. Floodplain Management - Floodplain Designation and Approvals - FPR Nos. 98-463, <br />- ill 98-464, and 98-465 <br />Tape I, Start/Stop: 1971 - 2173 <br />Action: A motion was made by Janice Sheftel that the Board approve the Flood <br />Insurance Study for the City ofLongmont, the Flood Insurance Study for the <br />City ofFt. Collins, and the Comprehensive Drainage Plan for the City of <br />Greeley. The motion was seconded by David Smith and approved <br />unanimously (9-0). <br /> <br />5aiv. Floodplain Management - Floodplain Designation and Approvals - FPR No. 9-466 <br />Tape I, Start/Stop: 0000 - 0000 <br />Action: Ibis item was withdrawn from the agenda <br /> <br />5b. Floodplain Management - South Platte River Right-of-Way Request <br />Tape I, Start/Stop: 2170 - 2300 <br />Action: A motion was made by Alan Hamel and Allen Davey simultaneously that <br />the Board approve the staff recommendation to grant to the South Metro <br />Fire Training Academy a non-exclusive right-of-way for a storage structure <br />over another non-exclusive right-of-way for Ron Koch Landscaping. The <br />motion was seconded by David Smith and approved unanimously (8-0). <br /> <br />5ci. Floodplain Management - Informational Items - Report from the Colorado Flood <br />Task Force regarding "Flood Threat 1998." <br />Tape I, Start/Stop: 2300 - 2774 <br />Action: Ibis was an informational item; no action taken. <br /> <br />5ci. <br /> <br />Floodplain Management - Informational Items - Status Report on the Colorado <br />Extreme Precipitation Investigation Project. <br />Tape I, Start/Stop: 2300 - 2774 <br />Action: Ibis was an informational item; no action taken. <br /> <br />5ci. <br /> <br />Floodplain Management - Informational Items - Implementation Update for the <br />Roaring Fork Multi-Objective Floodplain Planning Project. <br />Tape I, Start/Stop: 2300 - 2774 <br />Action: Ibis was an informational item; no action taken. <br /> <br />6a.- <br />h. <br /> <br />Instream Flow Program - Amendments to ISF Appropriations and Ratification of <br />Stipulation - Case Nos. 5-90CW282; 303; 305; 306; 307; 309; 289 and C-90CW311 <br />Tape I, Start/Stop: 2774 - 3414 <br />Action: These items were taken together. Patricia Wells recused herself from this <br />item. Corrections were made so that map numbers matched numbers in the <br /> <br />Minutes May 11.12, 1998 <br />
The URL can be used to link to this page
Your browser does not support the video tag.